45231300
-
Construction work for water and sewage pipelines
45232411
-
Foul-water piping construction work
45232421
-
Sewage treatment works
45232423
-
Sewage pumping stations construction work
45232431
-
Wastewater pumping station
45232440
-
Construction work for sewage pipes
45252127
-
Wastewater treatment plant construction work
45259100
-
Wastewater-plant repair and maintenance work
45315100
-
Electrical engineering installation works
45351000
-
Mechanical engineering installation works
90481000
-
Operation of a sewage plant
Irish Water plan to undertake the following works:
• Refurbishment/Upgrade/Expansion of the
existing Enniscorthy Wastewater Treatment Plant
(WwTP).
• Refurbishment/Upgrade of the existing
infrastructure at St Johns Pumping Station and
Promenade Pumping Station.
• Provision of stormwater handling facilities.
It is intended that the works will be implemented
under a Design, Build and Operate (“DBO”) Contract.
Options:
yes
Description of options:
1 possible extension of the Operation Service for a further 3 years at the sole discretion of the Contracting Entity.
The procurement is related to a project and/or programme financed by European Union funds:
no