II.1)
Scope of the procurement
Supply and delivery of embankment fill material to the Morell River Flood Management Scheme, Turnings Lower, North Naas, Bodenstown, Co. Kildare
Reference number:
C86/24/12/6
44110000
-
Construction materials
Supplies
II.1.4)
Short description
The specification covers the Contractor’s requirements for the supply and delivery of material suitable for the construction of impermeable earthen embankments as part of the Morell River Flood Management Scheme. Where possible the material will be delivered to the site of the earthen embankment and deposited there. Alternatively, at the decision of OPW Site Supervisory Staff, the material may be deposited at designated stockpile locations.
A non-technical description of the required material is as follows:
A sub-soil material suitable for the construction of a homogenous earthen embankment. The material shall be an impermeable fine-grained cohesive soil, with a suitable moisture content that shall be capable of reasonable compaction. No rocks greater than 75mm in size shall be permitted in the soil. No organic material will be accepted.
II.1.6)
Information about lots
This contract is divided into lots:
no
II.1.7)
Total value of the procurement
Lowest offer:
0.01
EUR
/
Highest offer:
284750.00
EUR
taken into consideration
(excluding VAT)
II.2.2)
Additional CPV code(s)
44100000
-
Construction materials and associated items
44111000
-
Building materials
44140000
-
Products related to construction materials
44190000
-
Miscellaneous construction materials
44192000
-
Other miscellaneous construction materials
44420000
-
Goods used in construction
45220000
-
Engineering works and construction works
II.2.3)
Place of performance
Main site or place of performance:
52 St. Stephen's Green, Dublin 2 D02 DR67
II.2.4)
Description of the procurement
The specification covers the Contractor’s requirements for the supply and delivery of material suitable for the construction of impermeable earthen embankments as part of the Morell River Flood Management Scheme. Where possible the material will be delivered to the site of the earthen embankment and deposited there. Alternatively, at the decision of OPW Site Supervisory Staff, the material may be deposited at designated stockpile locations.
A non-technical description of the required material is as follows:
A sub-soil material suitable for the construction of a homogenous earthen embankment. The material shall be an impermeable fine-grained cohesive soil, with a suitable moisture content that shall be capable of reasonable compaction. No rocks greater than 75mm in size shall be permitted in the soil. No organic material will be accepted.
II.2.11)
Information about options
Options:
no
II.2.13)
Information about European Union funds
The procurement is related to a project and/or programme financed by European Union funds:
no