II.1)
Scope of the procurement
19/111 - The Provision of Systems Integrator Services, Design, Supply & Installation of Gas Analysis Equipment to Gas Networks Ireland
Reference number:
19/111
38432100
-
Gas-analysis apparatus
Services
II.1.4)
Short description
GNI is seeking to establish a Standalone Agreement for the Provision of Systems Integrator Services for the design (including hazard and operability study (HAZOP), layer of protection analysis (LOPA), hazard identification (HAZID)), supply, installation, commissioning and validation of the installed and commissioned natural gas analysis equipment at Moneynierin Above Ground Installation (AGI) in the Republic of Ireland, which is an entry point for gas into the GNI network. The Services provided must be in accordance with with all relevant gas industry/statutory regulations including, but not limited to IGEM TD13, IGEM SR25, ISO 10715, IS328, ISO 23874, IS EN 12186 and Safety, Health and Welfare at Work (Construction) Regulations 2013.
II.1.6)
Information about lots
This contract is divided into lots:
no
II.2.2)
Additional CPV code(s)
38432210
-
Gas chromatographs
38543000
-
Gas-detection equipment
39340000
-
Gas network equipment
44161100
-
Gas pipelines
II.2.3)
Place of performance
Main site or place of performance:
Mayo
II.2.4)
Description of the procurement
GNI is seeking to establish a Standalone Agreement for the Provision of Systems Integrator Services for the design (including hazard and operability study (HAZOP), layer of protection analysis (LOPA), hazard identification (HAZID)), supply, installation, commissioning and validation of the installed and commissioned natural gas analysis equipment at Moneynierin Above Ground Installation (AGI) in the Republic of Ireland, which is an entry point for gas into the GNI network. The Services provided must be in accordance with with all relevant gas industry/statutory regulations including, but not limited to IGEM TD13, IGEM SR25, ISO 10715, IS328, ISO 23874, IS EN 12186 and Safety, Health and Welfare at Work (Construction) Regulations 2013.
II.2.11)
Information about options
Options:
no
II.2.13)
Information about European Union funds
The procurement is related to a project and/or programme financed by European Union funds:
no
II.2.14)
Additional information
You must submit through the etenders system before the deadline. The submission deadline is strict & no submissions will be possible after the date & time specified in the PQQ documents. Please note that all tenders are electronic, as such NO paper copies will be accepted or read. Please submit via the etenders system not later than 12:00 hrs local time Wednesday 21st August 2019.