II.1)
Scope of the procurement
New Build Construction of a 25 Class Primary School with an 8 Class Special Needs Unit at Scoil Íosagáin, St Mary’s Road, Ardaravan, Buncrana, Co Donegal
Reference number:
19967D
45214200
-
Construction work for school buildings
Works
II.1.4)
Short description
Demolition of existing Sacred Heart and St. Columba`s School buildings, relocation and removal of temporary buildings, construction of a new build 2-storey 25 classroom Primary School incorporating 8 classrooms for Special Needs. The new building of 6335m2 GFA shall be constructed in 2 Phases with a third Phase for construction of 3 hard ball courts, car parking and associated siteworks.
Reserved Specialists for the Mechanical and Electrical Services Installations are being pre-selected and procured separately from the Main Contract and when procured will enter into contract with the Main Contractor.
II.1.5)
Estimated total value
Value excluding VAT: 13120000.00
EUR
II.1.6)
Information about lots
This contract is divided into lots:
no
II.2.2)
Additional CPV code(s)
45214200
-
Construction work for school buildings
II.2.3)
Place of performance
Main site or place of performance:
Scoil Íosagáin, St Mary’s Road, Ardaravan, Buncrana, Co Donegal
II.2.4)
Description of the procurement
Demolition of existing Sacred Heart and St. Columba`s School buildings, relocation and removal of temporary buildings, construction of a new build 2-storey 25 classroom Primary School incorporating 8 classrooms for Special Needs. The new building of 6335m2 GFA shall be constructed in 2 Phases with a third Phase for construction of 3 hard ball courts, car parking and associated siteworks.
Reserved Specialists for the Mechanical and Electrical Services Installations are being pre-selected and procured separately from the Main Contract and when procured will enter into contract with the Main Contractor.
Price is not the only award criterion and all criteria are stated only in the procurement documents
Value excluding VAT: 13120000.00
EUR
II.2.7)
Duration of the contract, framework agreement or dynamic purchasing system
Duration in months:
30
This contract is subject to renewal:
no
II.2.9)
Information about the limits on the number of candidates to be invited
Envisaged number of candidates:
8
Objective criteria for choosing the limited number of candidates:
as Suitability Assessment Questionnaire
II.2.10)
Information about variants
Variants will be accepted:
no
II.2.11)
Information about options
Options:
no
II.2.13)
Information about European Union funds
The procurement is related to a project and/or programme financed by European Union funds:
no
II.2.14)
Additional information
Reserved Specialists for the Mechanical and Electrical Services Installations are being pre-selected and procured separately from the Main Contract and when procured will enter into contract with the Main Contractor.