II.1)
Scope of the procurement
Limerick Urban Centre Revitalisation - O'Connell Street (Phase 1)
45233120
-
Road construction works
Works
II.1.4)
Short description
The proposed works provide for the redistribution of space on O’Connell Street from Denmark Street to Cecil Street, between various modes of transport and the public realm. There are currently two southbound traffic lanes on O’Connell Street between Denmark Street and Cecil Street. Kerbside activities are provided for along both sides of the street, including parking, disabled parking, taxi ranks, loading bays and bus stops. General parking occupies the majority of this space along the full length of the street.
The project will reduce the width of traffic lanes between Denmark Street and Cecil Street to a maximum of 3.0m and convert one lane to a bus lane between William Street and Cecil Street. Parking and other kerbside vehicular uses will be relocated.
II.1.5)
Estimated total value
Value excluding VAT: 7000000.00
EUR
II.1.6)
Information about lots
This contract is divided into lots:
no
II.2.2)
Additional CPV code(s)
44113000
-
Road-construction materials
44113800
-
Road-surfacing materials
45200000
-
Works for complete or part construction and civil engineering work
45213310
-
Construction work for buildings relating to road transport
45233121
-
Main road construction works
45233125
-
Road junction construction work
45233140
-
Roadworks
45233252
-
Surface work for streets
45233293
-
Installation of street furniture
45233300
-
Foundation work for highways, roads, streets and footpaths
II.2.3)
Place of performance
Main site or place of performance:
Merchant's Quay, Limerick
II.2.4)
Description of the procurement
The proposed works provide for the redistribution of space on O’Connell Street from Denmark Street to Cecil Street, between various modes of transport and the public realm. There are currently two southbound traffic lanes on O’Connell Street between Denmark Street and Cecil Street. Kerbside activities are provided for along both sides of the street, including parking, disabled parking, taxi ranks, loading bays and bus stops. General parking occupies the majority of this space along the full length of the street.
The project will reduce the width of traffic lanes between Denmark Street and Cecil Street to a maximum of 3.0m and convert one lane to a bus lane between William Street and Cecil Street. Parking and other kerbside vehicular uses will be relocated. This space will be adapted to provide wider footpaths, a northbound cycle lane, and additional public realm areas to include street furniture such as seating areas, trees, planting, bicycle stands, lighting, and water installations, all of which will contribute to the sense of place and make O'Connell Street a destination in and of itself as well as a transport link in the city centre.
Price is not the only award criterion and all criteria are stated only in the procurement documents
Value excluding VAT: 7000000.00
EUR
II.2.7)
Duration of the contract, framework agreement or dynamic purchasing system
Duration in months:
12
This contract is subject to renewal:
no
II.2.10)
Information about variants
Variants will be accepted:
no
II.2.11)
Information about options
Options:
no
II.2.13)
Information about European Union funds
The procurement is related to a project and/or programme financed by European Union funds:
yes
Identification of the project:
European Regional Development Fund - Urban Revitalization
II.2.14)
Additional information
See additional documents attached for further information.