II.1)
Scope of the procurement
Construction of a food Innovation and Incubator Hub Campus
Reference number:
Shortlisting Contractor 0219
45000000
-
Construction work
Works
II.1.4)
Short description
Construction of a food innovation and incubator hub
campus at Mellows, Teagasc Campus, Athenry, Co.
Galway. The Campus consists of the construction of
3 separate buildings: Building 1 - BIA EOLAS/BIA
OBAIR - construction of a 2 storey Learning Centre
(1200m2 Gross Floor Area). Building 2 H.P.S.U.
units - construction of a single storey building
(700m2 Gross Floor Area). Building 3 - Incubation
Units- single storey building (700m2 Gross Floor
Area) and general site works
II.1.6)
Information about lots
This contract is divided into lots:
no
II.1.7)
Total value of the procurement
Value excluding VAT:
5607791.00
EUR
II.2.2)
Additional CPV code(s)
45300000
-
Building installation work
45232452
-
Drainage works
45342000
-
Erection of fencing
45310000
-
Electrical installation work
45112000
-
Excavating and earthmoving work
45113000
-
Siteworks
45350000
-
Mechanical installations
45200000
-
Works for complete or part construction and civil engineering work
45000000
-
Construction work
45210000
-
Building construction work
II.2.4)
Description of the procurement
Construction of a food innovation and incubator hub
campus at Mellows, Teagasc Campus, Athenry, Co.
Galway. The Campus consists of the construction of
3 separate buildings: Building 1 - BIA EOLAS/BIA
OBAIR - construction of a 2 storey Learning Centre
(1200m2 Gross Floor Area). Building 2 H.P.S.U.
units - construction of a single storey building
(700m2 Gross Floor Area). Building 3 - Incubation
Units- single storey building (700m2 Gross Floor
Area) and general site works
Criteria below
Quality criterion
-
Name:
Quality
/
Weighting:
20%
Cost criterion
-
Name:
Price
/
Weighting:
80%
II.2.11)
Information about options
Options:
no
II.2.13)
Information about European Union funds
The procurement is related to a project and/or programme financed by European Union funds:
no