II.1)
Scope of the procurement
Construction of a new 2-span bridge over N3 adjacent to existing Snugborough Road Bridge
Reference number:
FCC/084/19
45233100
-
Construction work for highways, roads
Works
II.1.4)
Short description
The proposed works include:
- Construction of a new 2-span bridge over N3 with pile foundation immediately adjacent to existing Snugborough road bridge inclusive of footpath and cycle track.- Construction of a new 2-span pedestrian/cyclist bridge (with potential vehicle loading) with pile foundation to the north of Snugborough road.-Construction of 2 new pedestrian underpass.
II.1.5)
Estimated total value
Value excluding VAT: 15000000.00
EUR
II.1.6)
Information about lots
This contract is divided into lots:
no
II.2.2)
Additional CPV code(s)
45221111
-
Road bridge construction work
45221211
-
Underpass
45232440
-
Construction work for sewage pipes
45233126
-
Grade-separated junction construction work
II.2.3)
Place of performance
Main site or place of performance:
Dublin
II.2.4)
Description of the procurement
The proposed works include:
- Construction of a new 2-span bridge over N3with pile foundation immediately adjacent to existing Snugborough road bridge inclusive of footpath and cycle track.
- Construction of a new 2-span pedestrian/cyclist bridge (with potential vehicle loading) with pile foundation to the north of Snugborough road.
-Construction of 2 new pedestrian underpass. One underpass is located to the north of existing pedestrian underpass, and another underpass is located 30m south of the re-aligned N3 on-ramp.
- Construction of Reinforced Earth Wall
-Contractor designed elements to include design of precast concrete underpass structures, reinforced earth walls, and bridge beams.
- Modify existing bridge to one-way traffic flow southbound.
- Remove and replace existing bridge parapet with class H2 parapet.
- 9C main sewer diversion, with peak flows over 1000l/s. Works include construction of approximately 150m of new 1.2m dia new sewer line, constructing new chambers, modification of existing chambers and constructing chamber on existing sewer line. Over-pumping works will be required.
- Lane widening of the Snugborough Road northeast and southwest approaches to the interchange.
- Lane widening of the L3020, Blanchardstown Main Street (R806) and N3 On-Ramp.
- Realign the N3 eastbound on ramp.
- Upgrade Waterville roundabout into a signalised junction.
- Provision of improved cyclist and pedestrian facilities.
- 500mm dia AC watermain diversion
- Utilities diversion including BT, Eir, Irish Water, Smart Telecom, Virgin Media, gas distribution main.
-Drainage works including construction of detention basin, and underground water attenuation tank.
- Provision of public lighting, signage, CCTV road lining and landscaping associated with the above works.
Price is not the only award criterion and all criteria are stated only in the procurement documents
Value excluding VAT: 12000000.00
EUR
II.2.7)
Duration of the contract, framework agreement or dynamic purchasing system
Duration in months:
24
This contract is subject to renewal:
no
II.2.10)
Information about variants
Variants will be accepted:
no
II.2.11)
Information about options
Options:
no
II.2.13)
Information about European Union funds
The procurement is related to a project and/or programme financed by European Union funds:
no