II.1)
Scope of the procurement
RFT for Integrated PM Team
Reference number:
Opera Phase 1 and Phase 2
71541000
-
Construction project management services
Services
II.1.4)
Short description
The Client is seeking Project Management services for Phase 1 and Phase 2 of the development. The PM Service will include the Cost Management, Employer's Representative, Assigned Certifier and PSDP under a single point responsibility appointment.
The entire development is the subject of a planning application being made directly to An Bord Pleanala.
II.1.6)
Information about lots
This contract is divided into lots:
no
II.2.2)
Additional CPV code(s)
71247000
-
Supervision of building work
71248000
-
Supervision of project and documentation
71317210
-
Health and safety consultancy services
71324000
-
Quantity surveying services
71520000
-
Construction supervision services
72224000
-
Project management consultancy services
II.2.3)
Place of performance
Main site or place of performance:
V94XF67
II.2.4)
Description of the procurement
Restricted Procedure.
This Prequalification Stage is the first stage of a two stage tendering procedure. The applicants who are successful in the first stage will be shortlisted and invited to tender once the prequalification stage has concluded.
Price is not the only award criterion and all criteria are stated only in the procurement documents
II.2.7)
Duration of the contract, framework agreement or dynamic purchasing system
Duration in months:
48
This contract is subject to renewal:
no
II.2.9)
Information about the limits on the number of candidates to be invited
Envisaged number of candidates:
5
Objective criteria for choosing the limited number of candidates:
Refer to the SAQ Documents for details on criteria.
II.2.10)
Information about variants
Variants will be accepted:
no
II.2.11)
Information about options
Options:
no
II.2.13)
Information about European Union funds
The procurement is related to a project and/or programme financed by European Union funds:
yes
Identification of the project:
Funding has been secured for the project through the EIB and CEB