N52 Cloghan to Billistown Phase 2 - Turin to Billistown Realignment
Reference number:
WH5205 N52C2B Phase 2
45233100
-
Construction work for highways, roads
Works
II.1.4)
Short description
The N52 Cloghan to Billistown Phase 2 - Turin to Billistown Realignment comprises the construction of 6.0km of Type 1 Single Carriageway (S2) National Secondary road and associated works including:
(1) at grade junctions and links to existing road network
(2) accommodation works underpasses
(3) surface water drainage infrastructure
(4) utility diversions works, including ESB, Eir and Irish Water
(5) road signs, road markings and road studs
(6) site clearance and earthworks
(7) boundary treatment works and accommodation works
(8) landscaping works
(9) road pavements.
The contractor will be required to produce Traffic Management plans for the N52 National Secondary road and local roads. The contractor will also be appointed as the Project Supervisor Construction Stage (PSCS).
The full scope of the work and obligations of the contractor are to be ascertained by reference to the contract documents as a whole.
II.1.5)
Estimated total value
Value excluding VAT: 11000000.00
EUR
II.1.6)
Information about lots
This contract is divided into lots:
no
II.2.2)
Additional CPV code(s)
45233120
-
Road construction works
45233100
-
Construction work for highways, roads
II.2.3)
Place of performance
Main site or place of performance:
Co. Westmeath
II.2.4)
Description of the procurement
The N52 Cloghan to Billistown Phase 2 - Turin to Billistown Realignment comprises the construction of 6.0km of Type 1 Single Carriageway (S2) National Secondary road and associated works including:
(1) at grade junctions and links to existing road network
(2) accommodation works underpasses
(3) surface water drainage infrastructure
(4) utility diversions works, including ESB, Eir and Irish Water
(5) road signs, road markings and road studs
(6) site clearance and earthworks
(7) boundary treatment works and accommodation works
(8) landscaping works
(9) road pavements.
The contractor will be required to produce Traffic Management plans for the N52 National Secondary road and local roads. The contractor will also be appointed as the Project Supervisor Construction Stage (PSCS).
The full scope of the work and obligations of the contractor are to be ascertained by reference to the contract documents as a whole.
Price is not the only award criterion and all criteria are stated only in the procurement documents
Value excluding VAT: 11000000.00
EUR
II.2.7)
Duration of the contract, framework agreement or dynamic purchasing system
Duration in months:
18
This contract is subject to renewal:
no
II.2.10)
Information about variants
Variants will be accepted:
no
II.2.11)
Information about options
Options:
no
II.2.12)
Information about electronic catalogues
Tenders must be presented in the form of electronic catalogues or include an electronic catalogue
II.2.13)
Information about European Union funds
The procurement is related to a project and/or programme financed by European Union funds:
no