Prior information notice

Information

Published

Date of dispatch of this notice: 12/10/2018

Expire date: 12/11/2018

External Reference: 2018-224782

TED Reference: 2018/S 200-454485

Prior information notice

Prior information notice

Services

Directive 2014/24/EU

This notice is for prior information only

Section I: Contracting authority

I.1)

Name and addresses

National Transport Authority
N/A
Dun Scéine, Iveagh Court, Harcourt Lane
Dublin 2
D02 WT20
IE
Contact person: Mark Bradwell
Telephone: +353 01-8798300
Fax: +353 01-8798333
Internet address(es):
I.3)

Communication

Additional information can be obtained from
the abovementioned address:  
I.4)

Type of the contracting authority

National or federal agency/office
I.5)

Main activity

Other activity:  Transport

Section II: Object

II.1)

Scope of the procurement

II.1.1)

Title

BusConnects Dublin Core Bus Corridor Project - EIAR, TIA and Construction Strategy Contract
II.1.2)

Main CPV code

71313440  -  Environmental Impact Assessment (EIA) services for construction
II.1.3)

Type of contract

Services
II.1.4)

Short description

BusConnects Dublin, aims to overhaul the bus system in the Dublin Region through implementation of a range of initiatives including a network of new bus corridors, redesign of the bus network, state of the art ticketing, simpler fare structure and bus fleet with low emission technologies. 16 CBC’s have been identified that make up the radial bus network. The Authority will seek to appoint one supplier to prepare an EIAR including Transport Impact Assessment and the Construction Strategy for all 16 CBC’s in the coming weeks. Working in close collaboration with four teams of engineering designers responsible for delivering the design, the scope of services will relate to the preparation and delivery of the:
- EIAR;
- Transport Impact Assessment; and
- Construction Strategy for the complete radial network comprised of the 16 CBC’s.
Along with supporting the statutory planning process.
The procurement process is expected to be commenced early in November 2018.
II.1.6)

Information about lots

This contract is divided into lots: no
II.2)

Description

II.2.2)

Additional CPV code(s)

71000000  -  Architectural, construction, engineering and inspection services
71300000  -  Engineering services
71310000  -  Consultative engineering and construction services
71313000  -  Environmental engineering consultancy services
71313400  -  Environmental impact assessment for construction
71313410  -  Risk or hazard assessment for construction
71313420  -  Environmental standards for construction
71313430  -  Environmental indicators analysis for construction
71313450  -  Environmental monitoring for construction
90700000  -  Environmental services
90712000  -  Environmental planning
90712100  -  Urban environmental development planning
II.2.3)

Place of performance

Main site or place of performance:  
Dublin
II.2.4)

Description of the procurement

BusConnects Dublin, aims to overhaul the bus system in the Dublin Region through implementation of a range of initiatives including a network of new bus corridors, redesign of the bus network, state of the art ticketing, simpler fare structure and bus fleet with low emission technologies. Sixteen (16) Core Bus Corridor’s (CBC’s) have been identified that make up the radial bus network. The concept design for the 16 CBC’s has been completed. In general, Emerging Preferred Routes (EPR) have been identified and it is intended to carry out a non-statutory public consultation exercise on the proposed EPR’s between Q4 2018 and Q1 2019, following which the details of each EPR will be confirmed. Environmental considerations were taken account of in the assessment of possible route options leading to identification of the EPR.
The next stage of BusConnects Dublin involves developing the concept design to preliminary design and bringing the project through the statutory approval process. As such, the Authority will seek to appoint one supplier to prepare an Environmental Impact Assessment Report (EIAR) including Transport Impact Assessment and the Construction Strategy for all 16 CBC’s in the coming weeks. Working in close collaboration with four teams of engineering designers responsible for delivering the design, the scope of services will relate to the preparation and delivery of the:
- Environmental Impact Assessment Report;
- Transport Impact Assessment; and
- Construction Strategy for the complete radial network comprised of the 16 CBC’s.
Along with supporting the statutory planning process.
The procurement process is expected to be commenced early in November 2018.
II.3)

Estimated date of publication of contract notice:

05/11/2018

Section IV: Procedure

IV.1)

Description

IV.1.8)

Information about the Government Procurement Agreement (GPA)

The procurement is covered by the Government Procurement Agreement : yes
IV.2)

Administrative information

Section VI: Complementary information