II.1)
Scope of the procurement
Multi Supplier Framework for the provision of Capital Works to Ervia
Reference number:
18/057
45213100
-
Construction work for commercial buildings
Works
II.1.4)
Short description
The framework agreement will establish the terms governing contracts to be awarded during the term of the framework agreement. The framework agreement will be established for a term of four years with the option to extend for a further one-year period at the sole discretion of Ervia.
Ervia currently has a building estate comprising of over 20 office buildings nationally, ranging in size from 250 square metres to 5,000 square metres. This portfolio is expected to grow substantially as part of the transformation programme being undertaken as part of the Water Industry Operating Framework being rolled out by Irish Water. For the full scope of building works and services please refer to PQQ Document.
II.1.6)
Information about lots
This contract is divided into lots:
no
II.2.2)
Additional CPV code(s)
44112000
-
Miscellaneous building structures
45210000
-
Building construction work
45211350
-
Multi-functional buildings construction work
45213200
-
Construction work for warehouses and industrial buildings
II.2.3)
Place of performance
Main site or place of performance:
ROI
II.2.4)
Description of the procurement
The Scope of Work is the provision of Capital Works to Ervia.
The framework agreement will establish the terms governing contracts to be awarded during the term of the framework agreement. The framework agreement will be established for a term of four years with the option to extend for a further one-year period at the sole discretion of Ervia.
Ervia currently has a building estate comprising of over 20 office buildings nationally, ranging in size from 250 square metres to 5,000 square metres. This portfolio is expected to grow substantially as part of the transformation programme being undertaken as part of the Water Industry Operating Framework being rolled out by Irish Water. The building portfolio will then grow to include the following types of building:
• Materials Depots / Waste Compounds / Stores / Transport Yards
• Water and Wastewater Laboratories
• Training centres
• Welfare Facilities
• Residential Properties
• Ancillary Buildings to Water/Wastewater Treatment Plants and Gas Installations
The scope building works and services shall include but shall not be limited to:
• Minor building extensions
• Demolition works
• Refurbishment / Renovations / Upgrades of existing buildings (exterior and interior works)
• Office fit out projects including but not limited to Architectural works, Mechanical services, Electrical services and Communication backbone infrastructure establishment
• Control Room fit out projects including but not limited to Architectural works, Mechanical services, Electrical services and Communication backbone infrastructure establishment
• Upgrade / replacement of critical Mechanical and Electrical systems that serve our office buildings and our critical assets such as Data Centres, Control Room and Disaster Recovery Sites
• Building fabric upgrade and replacement (facades and roofs)
• Site infrastructure works such as retaining walls, underground utilities, roads, pavements, compounds and security fencing
• Hard and soft Landscaping
• Main Contractor role where Ervia have procured specialist services independently ahead of appointing the Main Contractor. These specialist services may be appointed directly and enter into contract with Ervia or maybe be selected by Ervia and novated or nominated over to the Main Contractor. The Main Contractor shall be responsible for the coordination, management and supervision of these specialist subcontractors.
• The role of Project Supervisor Construction Stage and Contractor, as described in the Safety, Health and Welfare at Work (Construction) Regulations 2013, will form part of this scope.
•In some cases role of Designer, as described in the Safety, Health and Welfare at Work (Construction) Regulations 2013, will form part of this scope. For example where : (a)Specialist permanent works design may be required in the case of electrical, mechanical, structural or architectural and
•(b) Where temporary works design may be required such as shuttering, traffic management, temporary electrical systems, propping, supporting, specialist scaffolding etc.
Price is not the only award criterion and all criteria are stated only in the procurement documents
II.2.7)
Duration of the contract, framework agreement or dynamic purchasing system
Duration in months:
48
This contract is subject to renewal:
yes
Description of renewals:
1 year extension
II.2.9)
Information about the limits on the number of candidates to be invited
Envisaged number of candidates:
25
II.2.10)
Information about variants
Variants will be accepted:
no
II.2.11)
Information about options
Options:
yes
Description of options:
1 year extension
II.2.13)
Information about European Union funds
The procurement is related to a project and/or programme financed by European Union funds:
no
II.2.14)
Additional information
You must submit through the etenders system before
the deadline. The submission deadline is strict & no
submissions will be possible after the date & time
specified in the PQQ documents. Please note that
all tenders are electronic, as such NO paper copies
will be accepted or read. Please submit via the
etenders system not later than 12:00hrs (local time)
Monday 13th of August 2018.