II.1)
Scope of the procurement
Electrical Installations Reserved Specialists for Holy Family Special School, Cootehill.
Reference number:
19439B -Electrical Specialist
45310000
-
Electrical installation work
Works
II.1.4)
Short description
The works shall include complete electrical services installation & sub-specialists works (CCTV, Security, Fire alarms, Access controls, LV Switchgear, Lighting controls, Emergency Lighting, small power, induction loops, lightning protection etc) associated with the development of a new 1-2 storey replacement Special need’s School building with 26 classrooms and associated ancillary accommodation with 94no. car parking spaces, bus drop-off, 1 no. sports pitch, play areas, sensory garden and site boundary treatment with landscaping to include connection to external perimeter pavement. The total floor area of the new school will be 5310m².
A 16 classroom single storey prefabricated modular temporary school is to be constructed on an alternative site prior for decant purposes during the construction of the new school.
II.1.6)
Information about lots
This contract is divided into lots:
no
II.1.7)
Total value of the procurement
Lowest offer:
770899.23
EUR
/
Highest offer:
1153692.00
EUR
taken into consideration
(excluding VAT)
II.2.2)
Additional CPV code(s)
45214200
-
Construction work for school buildings
45214230
-
Special school construction work
45350000
-
Mechanical installations
II.2.3)
Place of performance
Main site or place of performance:
Cootehill
II.2.4)
Description of the procurement
The works shall include complete electrical services installation & sub-specialists works (CCTV, Security, Fire alarms, Access controls, LV Switchgear, Lighting controls, Emergency Lighting, small power, induction loops, lightning protection etc) associated with the development of a new 1-2 storey replacement Special need’s School building with 26 classrooms and associated ancillary accommodation with 94no. car parking spaces, bus drop-off, 1 no. sports pitch, play areas, sensory garden and site boundary treatment with landscaping to include connection to external perimeter pavement. The total floor area of the new school will be 5310m².
A 16 classroom single storey prefabricated modular temporary school is to be constructed on an alternative site prior for decant purposes during the construction of the new school.
II.2.11)
Information about options
Options:
no
II.2.13)
Information about European Union funds
The procurement is related to a project and/or programme financed by European Union funds:
no