N70 Kilderry Bends Improvement Scheme - Road Construction Contract
Reference number:
N70 Kilderry Bends CN
45000000
-
Construction work
Works
II.1.4)
Short description
This scheme includes the realignment of 3.5km of the N70 between Milltown and Killorglin in County Kerry. The proposed new road will comprise of approximately 3.5km of Type 2 Single Carriageway with a climbing lane c. 1km in length.
The project includes 2 staggered junctions with local roads. Structures required by the project include one stock underpass, and one watercourse crossing. The project will also include site clearance (including approximately 800m of woodland), earthworks, drainage (including a new off-site outfall to the River Laune), pavement, fencing, signs & lining, safety barrier, accommodation works and all other elements necessary for the successful construction and completion of the project.
II.1.6)
Information about lots
This contract is divided into lots:
no
II.1.7)
Total value of the procurement
Value excluding VAT:
5000000.00
EUR
II.2.2)
Additional CPV code(s)
45200000
-
Works for complete or part construction and civil engineering work
45220000
-
Engineering works and construction works
45222000
-
Construction work for engineering works except bridges, tunnels, shafts and subways
45223000
-
Structures construction work
II.2.3)
Place of performance
NUTS code:
IE053 -
South-West
Main site or place of performance:
Milltown-Killorglin
II.2.4)
Description of the procurement
This scheme includes the realignment of 3.5km of the N70 between Milltown and Killorglin in County Kerry. The proposed new road will comprise of approximately 3.5km of Type 2 Single Carriageway with a climbing lane c. 1km in length.
The project includes 2 staggered junctions with local roads. Structures required by the project include one stock underpass, and one watercourse crossing. The project will also include site clearance (including approximately 800m of woodland), earthworks, drainage (including a new off-site outfall to the River Laune), pavement, fencing, signs & lining, safety barrier, accommodation works and all other elements necessary for the successful construction and completion of the project.
II.2.11)
Information about options
Options:
no
II.2.13)
Information about European Union funds
The procurement is related to a project and/or programme financed by European Union funds:
no