II.1)
Scope of the procurement
Construction of a New Student Accommodation and ancillary student support facilities at Victoria Cross, Cork for University College Cork
Reference number:
171215 UCC Crows Nest
45000000
-
Construction work
Works
II.1.4)
Short description
The project consists of the demolition of the existing structures onsite including the now derelict Crow’s Nest public house and restaurant, four two-storey dwellings at 1-4 Victoria Terrace and the existing machinery shed and yard; The construction of a student accommodation building comprising approximately 255 student accommodation bed spaces and ancillary student support facilities at ground floor level including laundry, admin office and meeting room, common rooms, and comms rooms. A medical facility/wellness centre and 1 no. ancillary commercial/café unit are also provided at ground floor level as well as 128 no. bicycle parking spaces; plant room, switch room and sub-station; vehicular access ; foul and surface water sewers; works to the public footpath; and all other associated site services, site infrastructure and site development works.
II.1.5)
Estimated total value
Value excluding VAT: 19500000.00
EUR
II.1.6)
Information about lots
This contract is divided into lots:
no
II.2.2)
Additional CPV code(s)
39000000
-
Furniture (incl. office furniture), furnishings, domestic appliances (excl. lighting) and cleaning products
45210000
-
Building construction work
45214400
-
Construction work for university buildings
45223500
-
Reinforced-concrete structures
45262211
-
Pile driving
45262650
-
Cladding works
45310000
-
Electrical installation work
45350000
-
Mechanical installations
45400000
-
Building completion work
45443000
-
Facade work
II.2.3)
Place of performance
Main site or place of performance:
College Road, Cork
II.2.4)
Description of the procurement
The project consists of the demolition of the existing structures onsite including the now derelict Crow’s Nest public house and restaurant, four two-storey dwellings at 1-4 Victoria Terrace and the existing machinery shed and yard; The construction of a student accommodation building comprising approximately 255 student accommodation bed spaces and ancillary student support facilities at ground floor level including laundry, admin office and meeting room, common rooms, and comms rooms. A medical facility/wellness centre and 1 no. ancillary commercial/café unit are also provided at ground floor level as well as 128 no. bicycle parking spaces; plant room, switch room and sub-station; and a new vehicular service entrance from the Carrigrohane Road; and all ancillary works including a landscaped courtyard open space at ground floor level and a landscaped podium at first floor podium level; foul and surface water sewers; works to the public footpath; and all other associated site services, site infrastructure and site development works.
Price is not the only award criterion and all criteria are stated only in the procurement documents
Value excluding VAT: 19500000.00
EUR
II.2.7)
Duration of the contract, framework agreement or dynamic purchasing system
Duration in months:
16
This contract is subject to renewal:
no
II.2.9)
Information about the limits on the number of candidates to be invited
Envisaged number of candidates:
5
II.2.10)
Information about variants
Variants will be accepted:
no
II.2.11)
Information about options
Options:
no
II.2.13)
Information about European Union funds
The procurement is related to a project and/or programme financed by European Union funds:
no
II.2.14)
Additional information
Refer to Project Information Memorandum & Suitability Assessment Questionnaire