II.1)
Scope of the procurement
Design and Build Specification 12m Research Vessel
Reference number:
Bord Iascaigh Mhara 2017
34513100
-
Fishing vessels
Supplies
II.1.4)
Short description
In 2008, BIM launched its inshore survey vessel MV T.Burke which has been offering survey services to various stakeholders in aquaculture and inshore fisheries all around the coast of Ireland. The main task of the vessel is to identify seed mussel beds around the coast of Ireland using various sampling equipment and sonar systems but it has been involved in inshore diving operations, sites prospections, underwater videos surveys, various shellfish stock assessment as well as support vessel for various events.
The demand for all those tasks has increased over the past few years and our current vessel has proven to be too small and too slow to answer such a demand. Currently, the vessel is spending between 70 and 85 days working including transfer from one part of the coast to another. In order to continue and improve such services, it was decided to look for an upgrade.
II.1.6)
Information about lots
This contract is divided into lots:
no
II.1.7)
Total value of the procurement
Value excluding VAT:
765000.00
EUR
II.2.2)
Additional CPV code(s)
34513100
-
Fishing vessels
II.2.3)
Place of performance
Main site or place of performance:
Ireland
II.2.4)
Description of the procurement
In 2008, BIM launched its inshore survey vessel MV T.Burke which has been offering survey services to various stakeholders in aquaculture and inshore fisheries all around the coast of Ireland. The main task of the vessel is to identify seed mussel beds around the coast of Ireland using various sampling equipment and sonar systems but it has been involved in inshore diving operations, sites prospections, underwater videos surveys, various shellfish stock assessment as well as support vessel for various events.
The demand for all those tasks has increased over the past few years and our current vessel has proven to be too small and too slow to answer such a demand. Currently, the vessel is spending between 70 and 85 days working including transfer from one part of the coast to another. In order to continue and improve such services, it was decided to look for an upgrade.
BIM now invites tenders for the provision of the Design and the build of a 12 meter survey vessel. A detailed specification of requirements is set out in Section 2 of this document.
Criteria below
Quality criterion
-
Name:
• Suitability and quality of equipment
/
Weighting:
40
Quality criterion
-
Name:
• Excess above specification
/
Weighting:
10
Price
-
Weighting:
40
II.2.11)
Information about options
Options:
no
II.2.13)
Information about European Union funds
The procurement is related to a project and/or programme financed by European Union funds:
no