II.1)
Scope of the procurement
Design, specify and supply an AC to AC power take off and control system for 25kW Hydro-kinetic Turbine
Reference number:
DesignPro DPR25 PTO & Control
31000000
-
Electrical machinery, apparatus, equipment and consumables; lighting
Supplies
II.1.4)
Short description
DesignPro is developing a prototype 25kW hydro-kinetic turbine to convert kinetic energy in water flows to electrical power. The design of unit incorporates 2 hydro-kinetic turbines that each drive standard induction motors via an in line gearbox to generate 3 phase AC power. The power output varies with the rotation of the turbines. DesignPro requires an integrated PLC control system + AC to AC power take off system that can utilise the operational parameters of standard 3 phase induction motors to control turbine rotational speed so as to optimise power output and efficiency. The system must also be capable of adapting the initial power outputs of the induction motors to a standard that is acceptable for injection into the power grid. The gearboxes and induction motors will be supplied separately and do not form part of this tender request. Tenders for the design, specification and supply of the PLC control system + AC to AC power take off are being requested
II.1.5)
Estimated total value
Value excluding VAT: 40000.00
EUR
II.1.6)
Information about lots
This contract is divided into lots:
no
II.2.2)
Additional CPV code(s)
31200000
-
Electricity distribution and control apparatus
II.2.3)
Place of performance
NUTS code:
IE051 -
Mid-West
Main site or place of performance:
Design and bench testing at supplier site, prototype integration and testing at DesignPro site
II.2.4)
Description of the procurement
DesignPro is developing a prototype 25kW hydro-kinetic turbine to convert kinetic energy in water flows to electrical power. The design of unit incorporates 2 hydro-kinetic turbines that each drive standard induction motors via an in line gearbox to generate 3 phase AC power. The power output varies with the rotation of the turbines. DesignPro requires an integrated PLC control system + AC to AC power take off system that can utilise the operational parameters of standard 3 phase induction motors to control turbine rotational speed so as to optimise power output and efficiency. The system must also be capable of adapting the initial power outputs of the induction motors to a standard that is acceptable for injection into the power grid. The gearboxes and induction motors will be supplied separately and do not form part of this tender request. Tenders for the design, specification and supply of the PLC control system + AC to AC power take off are being requested
Price is not the only award criterion and all criteria are stated only in the procurement documents
Value excluding VAT: 40000.00
EUR
II.2.7)
Duration of the contract, framework agreement or dynamic purchasing system
Start:
2017-10-30
/
End:
2018-06-30
This contract is subject to renewal:
no
II.2.10)
Information about variants
Variants will be accepted:
no
II.2.11)
Information about options
Options:
no
II.2.13)
Information about European Union funds
The procurement is related to a project and/or programme financed by European Union funds:
yes
Identification of the project:
H2020 SME Instrument