45100000
-
Site preparation work
45111000
-
Demolition, site preparation and clearance work
45113000
-
Siteworks
45210000
-
Building construction work
45214000
-
Construction work for buildings relating to education and research
45300000
-
Building installation work
45310000
-
Electrical installation work
45313000
-
Lift and escalator installation work
45320000
-
Insulation work
45331000
-
Heating, ventilation and air-conditioning installation work
45350000
-
Mechanical installations
45400000
-
Building completion work
45420000
-
Joinery and carpentry installation work
45430000
-
Floor and wall covering work
45443000
-
Facade work
45450000
-
Other building completion work
45451000
-
Decoration work
Main site or place of performance:
College Road, Cork
The Proposed new UCC Student Hub will integrate the Student Support model
providing
(a) Student Learning- Flexible learning spaces, formal small group shared
learning spaces and informal social learning spaces in a technology rich
environment
(b) Student Development & Employability - An integrated student services
model in one central location fostering new relationships and creating new
synergies in support of students’ personal development, employability skills
development and academic success
(c) Student Administration Services -A one-stop-shop to facilitate more student
friendly, accessible and efficient student administrative services
Uniquely the Hub will accommodate in one centre these three major aspects of
the student experience demonstrating their interdependence in providing a
holistic education to students.
The development will consist of the construction of a six storey Student Hub
Building within the university campus adjoining College Road and Gaol Walk,
Cork. The building will be used to provide student and administrative services
and flexible learning spaces. The gross floor space will be 3991m2 .The
proposed works will involve demolitions, alterations and extensions to the
existing Windle Building, the removal of some existing car parking spaces and
the provision of new hard and soft landscaping and lighting.
The proposed works will also include permanent alterations to the existing main
entrance route to the campus from College Road, construction of a new storage
shed and temporary dismantling and reinstatement of the Old Gaol Entrance to
facilitate access during construction.The proposed development involves the
carrying out of works within the curtilage of two protected structures: Crawford
Observatory and Gates onto Western Road (PS 538) and University College
Cork Main Quad (PS 963).
The procurement is related to a project and/or programme financed by European Union funds:
no
UCC hereby issues this information in accordance
with the requirements of EC directive 2004/18/EC
(restricted procedure) for applicants and is inviting
expressions of interest from Works Contractors as
the first stage of a two stage process under the
restricted procedure.