II.1)
Scope of the procurement
Civils Works at UBC43A Underbridge on the Dublin to Cork Railway Line
Reference number:
6820
45221112
-
Railway bridge construction work
Works
II.1.4)
Short description
Iarnrod Éireann (IÉ) wish to pre-qualify experienced and proven companies to tender for the construction of a new underbridge (UBC43A) at 18 miles 880 yards on the Dublin-Cork railway line.
The project will be carried out by Iarnród Éireann as enabling works for Kildare County Council to facilitate the construction of the combined M7 Osberstown Interchange and R407 Sallins Bypass Scheme.
The proposed R407 Sallins Bypass, a dual carriageway, will cross under the Cork Line at 18 miles 880 yards for which a new underbridge is to be constructed to accommodate same.
A full railway shutdown for 84-hours over the Easter period 2018 will be in place to facilitate installation of the bridge units and wingwall units.
The proposed construction duration will be 12 months.
A Pre-Qualification Questionnaire , and drawings to provide some overview information regarding the scope of the works as currently anticipated, are both attached to this notice.
II.1.5)
Estimated total value
Value excluding VAT: 5000000.00
EUR
II.1.6)
Information about lots
This contract is divided into lots:
no
II.2.2)
Additional CPV code(s)
45200000
-
Works for complete or part construction and civil engineering work
45221100
-
Construction work for bridges
II.2.3)
Place of performance
Main site or place of performance:
Sallins, Co. Kildare
II.2.4)
Description of the procurement
Iarnrod Éireann (IÉ) wish to pre-qualify experienced and proven companies to tender for the construction of a new underbridge (UBC43A) at 18 miles 880 yards on the Dublin-Cork railway line.
The project will be carried out by Iarnród Éireann as enabling works for Kildare County Council to facilitate the construction of the combined M7 Osberstown Interchange and R407 Sallins Bypass Scheme.
The proposed R407 Sallins Bypass, a dual carriageway, will cross under the Cork Line at 18 miles 880 yards for which a new underbridge is to be constructed to accommodate same.
The scope of works will include but is not limited to the following:
• installation of rock socketed contiguous /secant piles and minipiles to form the temporary works zone to facilitate excavation of the railway embankment and installation of the proposed precast concrete units forming the twin-box structure.
• supply &/or construction of precast concrete units and installation of dual underpass structure (internal dimension for each underpass segmental unit is 10.8m wide x 5.88m high with floor, wall and roof thickness of 800mm)
• Associated fill to structures
• Precast wingwall structures
• Associated drainage works
• Numerous services diversions including signalling and esat cables.
A full railway shutdown for 84-hours over the Easter period 2018 will be in place to facilitate installation of the bridge units and wingwall units.
The proposed construction duration will be 12 months.
A Pre-Qualification Questionnaire , and drawings to provide some overview information regarding the scope of the works as currently anticipated, are both attached to this notice.
Price is not the only award criterion and all criteria are stated only in the procurement documents
Value excluding VAT: 5000000.00
EUR
II.2.7)
Duration of the contract, framework agreement or dynamic purchasing system
Duration in months:
12
This contract is subject to renewal:
no
II.2.10)
Information about variants
Variants will be accepted:
no
II.2.11)
Information about options
Options:
no
II.2.13)
Information about European Union funds
The procurement is related to a project and/or programme financed by European Union funds:
no