II.1)
Scope of the procurement
Technical & Economic Consultancy Support for Networs - (PR4 Implementation & ECP)
Reference number:
011-03-359
71621000
-
Technical analysis or consultancy services
Services
II.1.4)
Short description
CER regulates the level of revenue which the electricity Transmission System Operators (TSO), electricity Distribution System Operators (DSO), electricity Transmission Asset Owner (TAO) and electricity Distribution Asset Owner (DAO) (collectively the “network companies” can recover from customers to cover their respective costs.
Existing policy for connection of exporting generators to the electricity network in Ireland is captured under two broad processing approaches: the Group Processing Approach (GPA) and the Non-Group Processing Approach (non-GPA).
The successful tenderer will be required to provide the CER with expert economic and technical advice in relation to these decisions at various stages of the CER’s consultation and decision making process.
A detailed specification of requirements is set out in Appendix 1 of the Request For Tender( RFT) available to download from www.etenders.gov.ie
II.1.5)
Estimated total value
Value excluding VAT: 250000.00
EUR
II.1.6)
Information about lots
This contract is divided into lots:
yes
Tenders may be submitted for
all lots
Price Review 4 (PR4) Implementation
Lot No:
1
II.2.2)
Additional CPV code(s)
66171000
-
Financial consultancy services
71356000
-
Technical services
71356200
-
Technical assistance services
71356300
-
Technical support services
72220000
-
Systems and technical consultancy services
II.2.3)
Place of performance
NUTS code:
IE021 -
Dublin
II.2.4)
Description of the procurement
The CER regulates the level of revenue which the electricity transmission system operator (TSO), the electricity distribution system operator (DSO), the electricity transmission asset owner (TAO) and the electricity distribution asset owner (DAO) (collectively the “network companies”) can recover from customers to cover their respective costs. The nature of such regulation is that every five years the CER sets the amount of money that the network companies can collect from electricity customers for the following five years (price review - PR). The CER has carried out four price reviews to date, the most recent for the 2016-2020 period (PR4).
As part of PR4 the CER aims to amend the existing reporting, monitoring and incentive frameworks. In particular, in its decisions on transmission and distribution revenue for PR4 (CER/15/296 and CER/15/295 respectively).
The CER is going to consult upon and take decisions in relation to reporting and monitoring, incentives and the strategic innovation found.
The successful tenderer will be required to provide the CER with expert economic and technical advice in relation to these decisions at various stages of the CER’s decision making process.
A detailed specification of requirements is set out in Appendix 1 of the Request For Tender
Price is not the only award criterion and all criteria are stated only in the procurement documents
Value excluding VAT: 132000.00
EUR
II.2.7)
Duration of the contract, framework agreement or dynamic purchasing system
Start:
01/04/2017
/
End:
31/03/2018
This contract is subject to renewal:
no
II.2.10)
Information about variants
Variants will be accepted:
no
II.2.11)
Information about options
Options:
no
II.2.13)
Information about European Union funds
The procurement is related to a project and/or programme financed by European Union funds:
no
Enduring Connection Policy (ECP)
Lot No:
2
II.2.2)
Additional CPV code(s)
66171000
-
Financial consultancy services
71356000
-
Technical services
71356200
-
Technical assistance services
71356300
-
Technical support services
72220000
-
Systems and technical consultancy services
II.2.3)
Place of performance
NUTS code:
IE021 -
Dublin
II.2.4)
Description of the procurement
The CER regulates the level of revenue which the electricity transmission system operator (TSO), the electricity distribution system operator (DSO), the electricity transmission asset owner (TAO) and the electricity distribution asset owner (DAO) (collectively the “network companies”) can recover from customers to cover their respective costs. The nature of such regulation is that every five years the CER sets the amount of money that the network companies can collect from electricity customers for the following five years (price review - PR). The CER has carried out four price reviews to date, the most recent for the 2016-2020 period (PR4).
As part of PR4 the CER aims to amend the existing reporting, monitoring and incentive frameworks. In particular, in its decisions on transmission and distribution revenue for PR4 (CER/15/296 and CER/15/295 respectively).
The CER is going to consult upon and take decisions in relation to reporting and monitoring, incentives and the strategic innovation found.
The successful tenderer will be required to provide the CER with expert economic and technical advice in relation to these decisions at various stages of the CER’s decision making process.
A detailed specification of requirements is set out in Appendix 1 of the Request For Tender
Price is not the only award criterion and all criteria are stated only in the procurement documents
Value excluding VAT: 118000.00
EUR
II.2.7)
Duration of the contract, framework agreement or dynamic purchasing system
Start:
01/04/2017
/
End:
31/03/2018
This contract is subject to renewal:
no
II.2.10)
Information about variants
Variants will be accepted:
no
II.2.11)
Information about options
Options:
no
II.2.13)
Information about European Union funds
The procurement is related to a project and/or programme financed by European Union funds:
no