71310000
-
Consultative engineering and construction services
71311000
-
Civil engineering consultancy services
71311100
-
Civil engineering support services
71312000
-
Structural engineering consultancy services
71313000
-
Environmental engineering consultancy services
71313400
-
Environmental impact assessment for construction
71313440
-
Environmental Impact Assessment (EIA) services for construction
71320000
-
Engineering design services
71322000
-
Engineering design services for the construction of civil engineering works
71330000
-
Miscellaneous engineering services
71332000
-
Geotechnical engineering services
71335000
-
Engineering studies
71530000
-
Construction consultancy services
NUTS code:
IE025 -
South-West (IE)
Main site or place of performance:
Cork.
Cork County Council, acting as agents for the OPW now plans to commission a
project to develop a flood relief scheme (a ‘Scheme’) including structural works
and a fluvial flood forecasting system, if feasible. To develop the flood relief
scheme, Cork County Council will commission a Contract, hereafter referred to as
the ‘Project’, that shall comprise five stages, as set out below: Stage I:
Development of a number of flood defence options and the identification of a
preferred Scheme, and the design of a Fluvial Flood Forecasting System, if it is
feasible. Stage II: Outline Design and Public Exhibition or Planning including an
Appropriate Assessment (AA), Environmental Impact Statement (EIS) and Final
Flood Risk Management Plan Stage III: Detailed Design, Confirmation and
Tender Stage IV: Construction Stage V: Handover of Works The contract
focuses on Fluvial, Groundwater, Pluvial and Coastal Flood Risk through the
Midleton Study Area
The procurement is related to a project and/or programme financed by European Union funds:
no
Please refer to the Contract Documents