II.1)
Scope of the procurement
Limerick Gasworks Remediation _Phase 2 (Soil Stabilisation/ Solidification)
Reference number:
15/160
90732300
-
Polluted soil treatment or rehabilitation
Works
II.1.4)
Short description
Design of soil binder mixes and implementing Soil Stabilisation and Solidification works to contaminated soils 3m deep over a 1.4 ha site based on this design.
II.1.6)
Information about lots
This contract is divided into lots:
no
II.2.2)
Additional CPV code(s)
24327310
-
Coal tar
45110000
-
Building demolition and wrecking work and earthmoving work
45232220
-
Substation construction work
71322000
-
Engineering design services for the construction of civil engineering works
90722200
-
Environmental decontamination services
90722300
-
Land reclamation services
II.2.3)
Place of performance
II.2.4)
Description of the procurement
Soil excavated to depths of 3m over 1.4 ha site along with excavation to base of underground structures where >3m;
Screen and sort material into stockpiles of hard, suitable and unsuitable material;
Removal of unsuitable and recyclable materials to suitable facilities;
Crushing of hard materials and backfill site using suitable material from site, plus imported fill, if required;
Demolition of existing internal walls;
Utility relocation.
Price is not the only award criterion and all criteria are stated only in the procurement documents
II.2.7)
Duration of the contract, framework agreement or dynamic purchasing system
Duration in months:
12
This contract is subject to renewal:
no
II.2.10)
Information about variants
Variants will be accepted:
no
II.2.11)
Information about options
Options:
no
II.2.13)
Information about European Union funds
The procurement is related to a project and/or programme financed by European Union funds:
no
II.2.14)
Additional information
Please register your interest through etenders to access the Pre-Questionnaire documents for this competition.
Please submit all queries via email for the attention of The Shared Services Procurement
Manager to Tenders@ervia.ie
The questionnaire must be completed and returned to the address in I.1. above not later than 12.00hrs Friday 6th January 2017.