Contract notice

Information

Published

Date of dispatch of this notice: 30/09/2016

Expire date: 11/11/2016

External Reference: 2016-983069

TED Reference: 2016/S 191-342993

Contract notice

Cached Version

Contract notice

Directive 2014/24/EU

Section I: Contracting authority

I.1)

Name and addresses

IDA Ireland
N/A
Wilton Park House
Dublin 2
Wilton Place
IE
Contact person: Linda Corbett
Telephone: +353 906471516
NUTS code:  IE -  IRELAND
Internet address(es):
I.3)

Communication

Access to the procurement documents is restricted. Further information can be obtained at:  
http://irl.eu-supply.com/app/rfq/rwlentrance_s.asp?PID=103535&B=ETENDERS_SIMPLE
Additional information can be obtained from
the abovementioned address:  
Tenders or requests to participate must be submitted
to the following address: 
IDA Ireland
Wilton Park House
Dublin 2
IE
Contact person: Linda Corbett
Telephone: +353 906471516
NUTS code:  IE -  IRELAND
Internet address(es):
I.4)

Type of the contracting authority

Body governed by public law
I.5)

Main activity

Other activity:  Foreign Direct Investment

Section II: Object

II.1)

Scope of the procurement

II.1.1)

Title

IDA Ireland Athenry Strategic Site Infrastructure Works - Road Works Phase 2
Reference number:  2072
II.1.2)

Main CPV code

45233100  -  Construction work for highways, roads
II.1.3)

Type of contract

Works
II.1.4)

Short description

Construction of a new road, including two bridges. One of the bridges will cross a railway.
The site is in the townland of Ballygarraun, Athenry, Co. Galway. The works are a continuation of the Phase 1 roadworks that were completed in 2010. Phase 1 links the M6 Motorway and regional Road R348. Phase 2 will extend northwards from the R348 and will include the following, along with other works:
- Single carriageway over 600m in length;
- Footway / Cycleway of varying widths and length;
- A roundabout;
- A road over rail bridge;
- A road over road bridge;
- Earthworks;
- Fencing;
- Safety barrier systems and parapets;
- Drainage;
- Signing and lining;
- Lighting;
- Works for statutory authorities;
- Private and public utlities inclusive of diversion works;
- Ducting and chambers;
- Accommodation works and water supplies.
II.1.5)

Estimated total value

Value excluding VAT: 6200000.00  EUR
II.1.6)

Information about lots

This contract is divided into lots: no
II.2)

Description

II.2.2)

Additional CPV code(s)

45221110  -  Bridge construction work
45221112  -  Railway bridge construction work
II.2.3)

Place of performance

NUTS code:  IE -  IRELAND
Main site or place of performance:  
Ballygarraun, Athenry, Co. Galway
II.2.4)

Description of the procurement

Construction of a new road, including two bridges. One of the bridges will cross a railway.
The site is in the townland of Ballygarraun, Athenry, Co. Galway. The works are a continuation of the Phase 1 roadworks that were completed in 2010. Phase 1 links the M6 Motorway and regional Road R348. Phase 2 will extend northwards from the R348 and will include the following, along with other works:
- Single carriageway over 600m in length;
- Footway / Cycleway of varying widths and length;
- A roundabout;
- A road over rail bridge;
- A road over road bridge;
- Earthworks;
- Fencing;
- Safety barrier systems and parapets;
- Drainage;
- Signing and lining;
- Lighting;
- Works for statutory authorities;
- Private and public utlities inclusive of diversion works;
- Ducting and chambers;
- Accommodation works and water supplies.
II.2.5)

Award criteria

Criteria below
Price
II.2.6)

Estimated value

Value excluding VAT: 6200000.00  EUR
II.2.7)

Duration of the contract, framework agreement or dynamic purchasing system

Duration in months: 18
This contract is subject to renewal: no
II.2.9)

Information about the limits on the number of candidates to be invited

Envisaged number of candidates: 5
II.2.10)

Information about variants

Variants will be accepted: no
II.2.11)

Information about options

Options: no
II.2.13)

Information about European Union funds

The procurement is related to a project and/or programme financed by European Union funds: no

Section III: Legal, economic, financial and technical information

III.1)

Conditions for participation

III.1.1)

Suitability to pursue the professional activity, including requirements relating to enrolment on professional or trade registers

List and brief description of conditions:  Refer to Works Contractor Suitability Questionnaire.
III.1.2)

Economic and financial standing

Selection criteria as stated in the procurement documents
III.1.3)

Technical and professional ability

Selection criteria as stated in the procurement documents
III.2)

Conditions related to the contract

III.2.3)

Information about staff responsible for the performance of the contract

Obligation to indicate the names and professional qualifications of the staff assigned to performing the contract

Section IV: Procedure

IV.1)

Description

IV.1.1)

Type of procedure

Restricted procedure
IV.1.8)

Information about the Government Procurement Agreement (GPA)

The procurement is covered by the Government Procurement Agreement: no
IV.2)

Administrative information

IV.2.2)

Time limit for receipt of tenders or requests to participate

Date:  11/11/2016
Local time:  12:00
IV.2.3)

Estimated date of dispatch of invitations to tender or to participate to selected candidates

Date: 02/12/2016
IV.2.4)

Languages in which tenders or requests to participate may be submitted

English
IV.2.6)

Minimum time frame during which the tenderer must maintain the tender

Duration in months : 6  (from the date stated for receipt of tender)

Section VI: Complementary information

VI.1)

Information about recurrence

This is a recurrent procurement:  no
VI.3)

Additional information

All queries should be submitted through the e-tenders system.
If this is not possible queries can be submitted to:
Damian P Hanley, Ryan Hanley Ltd, Sherwood Avenue, Galway.
Tel: 091 587116
Email: hanleyd@ryanhanley.ie
Submissions shall comprise 1 hard copy and 1 soft copy (pdf).
Submissions shall be posted/delivered with the following address label:
"2072 - IDA Ireland - Athenry Road Works Phase 2
IDA Ireland
Wilton Park House
Dublin 2
Ireland"
VI.4)

Procedures for review

VI.4.1)

Review body

IDA Ireland
Wilton Place
Dublin 2
IE

VI.5)

Date of dispatch of this notice

30/09/2016