Notice for additional information, information on incomplete procedure or corrigendum

Information

Published

Date of dispatch of this notice: 22/04/2016

External Reference: 2016-178499

TED Reference: 2016/S 082-145270

Notice for additional information, information on incomplete procedure or corrigendum

Cached Version

Notice for additional information, information on incomplete procedure or corrigendum

Section I: Contracting authority/entity

I.1)

Name, addresses and contact point(s)

Curragh Racecourse Ltd
N/A
The Curragh, Co. Kildare
Co. Kildare  The Curragh
IE
For the attention of: Gerard Heffernan
Telephone: +353 045455635
E-mail: gerardheffernan@hri.ie
Internet address(es):
Address of the buyer profile: http://irl.eu-supply.com/ctm/Supplier/CompanyInformation/Index/84313
I.2)

Type of purchasing body

Contracting authority

Section II: Object of the contract

II.1)

Description

II.1.1)

Title attributed to the contract:

Curragh Racecourse Redevelopment (Contract Phase 1): Contract for the Enabling Works Package

II.1.2)

Short description of the contract or purchase(s)

Contract Phase 1: Enabling Works

The enabling works contract involves the demolition of the existing east and west

grandstand, the Turf Club Rooms incorporating the weigh room, existing areas of

hard landscaping, sections of perimeter walls, removal and disposal of asbestos,

termination and diversion of services, installation of new services such as surface

water and wastewater infrastructure within the main site, felling of a select

number of trees and tree protection.

A specialist requirement under the enabling works contract is for a conservation

contractor to dismantle, store and reconstruct the Queen‘s Room and adjoining

conservation elements. The reconstruction of the Queen‘s Room in a new

location on the site is proposed to commence in October 2018. Applicants must

propose a suitable works specialist and submit a QW3 questionnaire in relation

to this area of the contract.

Applicants should note that whilst the works will take place during the off-season

for racing, the gallops will remain operational throughout the enabling works

phase of the project with the racecourse remaining operational during the

construction phase of the project. A portion of the site will remain live during the

enabling works.

A more detailed description of the works is provided in the documentation

attached to this notice.

II.1.3)

Common procurement vocabulary (CPV)

Main vocabulary
45000000   Construction work
Supplementary vocabulary
45100000   Site preparation work
45110000   Building demolition and wrecking work and earthmoving work
45111000   Demolition, site preparation and clearance work
45111100   Demolition work
45111200   Site preparation and clearance work
45111290   Primary works for services
45111300   Dismantling works
45262660   Asbestos-removal work
45310000   Electrical installation work
45317200   Electrical installation work of transformers
45317300   Electrical installation work of electrical distribution apparatus
45454100   Restoration work

Section IV: Procedure

IV.2)

Administrative information

IV.2.2)

Notice reference for electronically submitted notices

Notice reference:  2016-844491
IV.2.4)

Date of dispatch of the original notice:

24.03.2016

Section VI: Complementary information

VI.1)

This notice involves:

Correction
VI.3)

Information to be corrected or added:

VI.3.1)

Modification of original information or publication on TED not compliant

Modification of original information
VI.3.2)

Notice or corresponding tender documents

In the original notice
VI.3.3)

Text to be corrected in the original notice

VI.3.4)

Dates to be corrected in the original notice

Place of dates to be modified:  IV.3.4)
Instead of: 
28.04.2016 - 13:00
Read: 
11.05.2016 - 13:00
VI.3.5)

Addresses and contact points to be corrected

VI.3.6)

Text to be added in the original notice

VI.4)

Other additional information:

VI.5)

Date of dispatch of this notice:

22.04.2016