Date of dispatch of this notice: 20/04/2016
External Reference: 2016-196494
TED Reference: 2016/S 080-142960
Date of dispatch of this notice: 20/04/2016
External Reference: 2016-196494
TED Reference: 2016/S 080-142960
Supply and delivery of fixed and friction buffer stops
Portlaoise
ORIGINAL NOTICE 2015/S 123-226145 PUBLISHED ON 30.06.2015 HAS BEEN CANCELLED AND IS NOW REPLACED BY THIS NOTICE, DUE TO SPECIFICATION AMENDMENT.
Iarnród Éireann (IÉ) invites applications from suitably qualified companies to
participate in the pre-qualification process for the proposed tender for the supply
and delivery of fixed and friction type buffer stops.
It is IÉ policy to provide a friction or fixed buffer stops at the termination of every passenger running line, including bay platform lines and on
freight lines and sidings where deemed necessary.
The Supplier must currently have designs for fixed and friction buffers that are
approved for use / currently in use on major European railway networks and the
design must be suitable for a track gauge of 1602mm.
The design must meet IÉ technical requirements and if not, it must have the
necessary design approvals for modification to meet IÉ requirements.
The Supplier must submit
1.Detailed dimensioned drawings of typical buffer types proposed for supply,
including braking elements and other part numbers must be provided with
submission – Pass/Fail
2. Calculations – each supplier must provide calculations demonstrating that the
rolling stock listed in table 3 of the specification can be accommodated within the
constraints provided in Table 4 of the specification – Pass/Fail
3. Confirmation of ability to meet the requirements of Tables 1, 2 and Appendix 1
of the specification must be provided with submission – Pass/Fail
4. Certification of compliance with current versions of EN1090-1 & EN1090-2
(EXC-3) must be provided with submission – Pass/Fail
A copy of IÉ technical specification for friction type and fixed type buffer stops is attached to this notice.
** Advertised as a fixed price contract valid for three years with the option to extend annually for up to a maximum of two additional years but now awarded as an eighteen month contract.
A PRE-QUALIFICATION QUESTIONNAIRE IS ALSO ATTACHED TO THIS NOTICE AND MUST BE COMPLETED AND RETURNED.
CCE5629
Supply of Buffer Stops
Some buffer stops may be related to projects financed by EU funds — it is not possible at this stage to identify these projects.
18 month contract awarded.