Date of dispatch of this notice: 30/03/2016
External Reference: 2016-417353
TED Reference: 2016/S 064-111502
Date of dispatch of this notice: 30/03/2016
External Reference: 2016-417353
TED Reference: 2016/S 064-111502
Invitation to Tender for Provision of Electricity Generator at Kinsale Rd Landfill Site Cork
Cork
The Kinsale Road Landfill ceased acceptance of waste in 2009.
It is estimated that at least 3 million tonnes of waste has been deposited over its 40 year lifetime. The site (approx 70 ha) is still the subject of an EPA landfill licence. The licenced area includes the existing Park and Ride Area which is located west of the main landfill and the South City Link Road.
A public Civic Amenity Site will continue to operate on the site in to the future.
The licence conditions require the Council to extract, collect and treat landfill gas generated on site from the decomposing waste.
The conditions are listed in EPA Waste Licence No. W0012-03 dated 3rd May 2011 (www.epa.ie).
In addition to the above, Cork City Council, as an energy consumer, has an obligation to reduce its energy consumption by 33% by the year 2020. Consequently, Cork City Council intends to generate electricity from landfill gas and offset the electricity units generated against its energy reduction obligations.
Cork City Council is now seeking tenders from suitably qualified and experienced companies who will under contract:
• Supply, install, commission and maintain the warranty of an electricity generator capable of producing 0.5MW of electricity from landfill gas at Kinsale Road Landfill Site. The duration of the contract shall be for a period of 5 years with the option to extend for a period of 1 year at the discretion of the Council.
• The plant warranty shall be for the 5 year duration of the contract with an option to extend same for a further year if required.
Invitation to Tender for Provision of Electricity Generator at Kinsale Rd Landfill Site Cork