15/159 - Ballyshannon Regional Water Supply Scheme Contract No.1 - Water Treatment Plant & Primary Network Design Build Operate Contract
Irish Water is currently advancing the Ballyshannon Regional Water Supply
Scheme Design Build Operate Contract comprising the construction of an intake
structure at Lough Assaroe, pumping station, new WTP at Knader, storage
reservoir(s) including all interconnecting pipework and some trunk/distribution
mains.
The works required under the contract are to be delivered on a Contractor Design-
Build-Operate basis. The DBO contract is 24 months D-B with a 7 year Operation
and Maintenance period, with an optional add on for up to 3 years.
The planned works are necessary to ensure compliance with EU Directives, Irish
National Standards and Regulations relating to treated water for human
consumption.
15/159
Two (2) signed hard copies and three (3) CDs, containing the same information in electronic format (in MS Word /MS Excel) of your completed Qualification Submission must be returned for the attention of: The Shared Services Procurement Manager, Ervia , PO Box 900, Webworks Cork, Eglinton Street, Cork, Ireland not later than 12:00hrs (local time) Wednesday 30th March 2016.