Date of dispatch of this notice: 06/01/2016
Expire date: 05/02/2016
External Reference: 2016-692591
TED Reference: 2016/S 005-004589
Date of dispatch of this notice: 06/01/2016
Expire date: 05/02/2016
External Reference: 2016-692591
TED Reference: 2016/S 005-004589
Seeking Lift Sub-Contractors for alterations and refurbishment of Unit 8 (A, B & C) as well as a 400sq.m extension to the rear of the building at Burlington Business Park, Sragh Avenue, Tullamore
Naas
Expressions of Interest are invited from suitably qualified Lift Contractors who
wish to be considered for the installation of 2No lifts within the overall project
described as follows:
Unit A: removal of internal walls and construction of new dock levellers and roller
doors to rear of building
Unit B: Provision of new canteen, office and archive areas (the latter of which will
be located in the basement and within a new mezzanine at first floor)
Unit C: Provision of new reception, offices, archive and other ancillary associated
area (archives will be located in the basement and within a new mezzanine at first
floor). New dock levellers and roller doors will be constructed to the rear of this
unit also.
Proposed extension, approximately 400sq.m, will be constructed to the rear of the
building to house the forklift charging station. Mechanical and Electrical services
will be upgraded throughout.
The two (2) new lifts will be installed to serve 3 floors, each having five (5) stops
to serve all staggered levels.
Expressions of Interest are invited from suitably qualified Lift Contractors who wish to be considered for the installation of 2No lifts within the overall project described as follows:
Unit A: removal of internal walls and construction of new dock levellers and roller doors to rear of building
Unit B: Provision of new canteen, office and archive areas (the latter of which will be located in the basement and within a new mezzanine at first floor)
Unit C: Provision of new reception, offices, archive and other ancillary associated area (archives will be located in the basement and within a new mezzanine at first floor). New dock levellers and roller doors will be constructed to the rear of this unit also.
Proposed extension, approximately 400sq.m, will be constructed to the rear of the building to house the forklift charging station. Mechanical and Electrical services will be upgraded throughout.
The two (2) new lifts will be installed to serve 3 floors, each having five (5) stops to serve all staggered levels.
HSE National Distribution Centre, Tullamore – seeking Lift Sub-Contractors for alterations and refurbishment of Unit 8 (A, B & C) as well as a 400sq.m extension to the rear of the building at Burlington Business Park, Sragh Avenue, Tullamore, Co. Offaly.
Lifts