Railway Panel Dismantling and Ferrous Scrap Disposal for Iarnród Éireann
Throughout the Iarnród Éireann rail network
Iarnród Éireann (IÉ) invites applications to participate in the pre-qualification
process to appoint suitably qualified companies to a qualification system for
Railway Panel Dismantling and Ferrous Scrap Disposal requirements that arise
on an ad-hoc basis.
Iarnród Éireann (IÉ) have quantities of scrap in various locations throughout the
network.
A location or a number of locations will form a “package“, bidders will have the
opportunity to bid for one or more packages.
a. Ferrous scrap - ready for shipment.
b. Ferrous scrap in assemblies of panels.
There are quantities of railway panels of various lengths (typically 45ft or 60 ft)
with steel rail affixed to either timber or concrete sleepers.
All of the Ferrous materials (rail and fixings) are to be disposed of as part of this
process.
Quantities tendered can be as small as 10 tonne and as large as 500 tonne.
There is a restriction on the disposal of creosoted timber sleepers but the
disposal of concrete sleepers may be incorporated into some packages.
The contractor will be required to dismantle the panels on site, and dispose of
the ferrous product, The creosoted sleepers (and /or other sleepers) are to be
retained on Iarnród Éireann‘s premises, stacked and bound and kept secure at
all times.
Those companies successfully appointed to the Qualification System will receive
all future tender enquiries.
The Qualification System will run from 1st January 2016 to 31st December 2018.
A Pre-Qualification Questionnaire is attached to this notice and must be
completed and returned as directed.
Railway Panel Dismantling and Ferrous Scrap Disposal requirements that arise on an ad-hoc basis.
The Qualification System will run from 1st January 2016 to 31st December 2018.
A grouping if successful must be prepared to contract as a single entity, or alternatively at Irish Rail‘s discretion,each member of the group will be required to execute the contract and have joint and several liability
See the attached pre-qualification questionnaire.