SmartPly invites expressions of interest from suitable qualified candidates who wish to be included within a Framework for the Engineering Design, Supply, Installation and Commmissioning of Mecha
Co Waterford
Lot 1. Piped Utilities; Engineering design, equipment supply, installation,
commissioning and documentation
Lot 2. Miscellaneous guarding, fencing, platforms, brackets and the like;
Engineering design, equipment supply, installation, commissioning and documentation
Lot 3. Mechanical Demolition;
Lot 4. Install new Equipment (supplied by others) and re-locate existing
Equipment);
Lot 5. Install Specialist new Equipment (supplied by others) associated with
Environmental Systems equipment);
The works have been separated into 5 no. separate lots. Candidates are invited to confirm their capability and resources to successfully carry out the works described in each lot.
SmartPly will assess the responses and will establish a list of selected candidates for each lot. SmartPly will reserve the right to allocate one or more lots to any particular candidate.
The scope of the works includes services such as compressed air, process water, resin/wax piping , thermal oil piping, demolitions, installation of new equipment, relocation of existing equipment together with machine guarding, safety fencing, platforms/pathways, stairs/ladders, brackets, secondary support steel, material ducts and miscellaneous mechanical works.
This notice is a voluntary publication from an Industrial Subsidiary of Public Authority therefore the EU Directive time-lines do not apply.
Smartply will not be responsible for any costs in connection with the procurement procedure, irrespective of the outcome, whether or not the procedure is cancelled or postponed.
Candidates are required to return 3 hard copies of their PQQ Submissions by the deadline date stated.
Please Refer to Attached PQQ Document for scope of
works
Please Refer to Attached PQQ Document for scope of
works
Please refer to attached PQQ for scope details
Please Refer to Attached PQQ Document for scope of
works
Please Refer to Attached PQQ Document for scope of
works
004