HOB Refurbishment Project (Design & Build)
Co Dublin
The Contracting Authority will produce a set of documents prior to issuing the Request for Proposal for the D&B contract; the documents will include Design Intent information accompanied with performance specifications. The documents will be referred to as the “Employers Requirements Documents”. The D&B Contractor shall complete the design in accordance with the Employers Requirement Documents with the object of constructing and handing over a refurbished office building fully commissioned and fit for purpose.
As per the RFI Document available to download at www.etenders.ie.
As per the RFI Document available to download at www.etenders.ie.
As per the RFI Document available to download at www.etenders.ie.
As per the RFI Document available to download at www.etenders.ie.
P2469
As per the RFI Document available to download at www.etenders.ie.