SmartPly Europe seeks expressions of interest for the Engineering Design, Supply and Install of New Extension to 20kV / 0.4kV HV Network for Renewal Project
Co Waterford
SmartPly Europe seeks expressions of interest for the Engineering Design, Supply and Install of New Extension to 20kV / 0.4kV HV Network for Renewal Project.
The general scope required is all inclusive for the engineering design, equipment supply, installation, commissioning and documentation of the extension from the existing 20kv substation up to and including the, 400V feeders to new and existing Motor Control Panels and General Services.
Preliminary Scope of Works but not limited to the following
1. Detailed study and analysis of Power requirements, Create data base of Existing + Decommissioned + New motor power. Include for updating of plant wide power single line diagram.(SLD)
2. Install and commission an extension to the existing 20kv ABB switch gear in the main sub (free issue).
3. Install new 2 x 20Kv RMU in MCC’s plan rooms
4. Install new 2 X 2500kVA ONAN transformers
5. Install new 3 x 400v LV Distribution boards
6. Install new 12/20kv cable 3x1x400mm2 aluminium core for ring to switchgear
7. Install new 3 x1x185 mm2 aluminium core for transformer’s
8. Install new Cable from the LV Distribution boards to the local Motor Control Panel and General Services Panels
9. Install new earthing including MV and LV earthing grids
10. Remote switching control panels within 20m of switchgear.
11. Safety documentation and O+M manuals
12. Supply and installation of synchronised LV power generator 1000KVA
13. Installing testing and commissioning of all HT work will be by approved specialist High Voltage Engineers.
This notice is a voluntary publication from an Industrial Subsidiary of Public Authority therefore the EU Directive time-lines do not apply.
Smartply will not be responsible for any costs in connection with the procurement procedure, irrespective of the outcome, whether or not the procedure is cancelled or postponed.
Candidates are requested to download, complete and return 3 hard copies by the deadline date stated.
001 - Phase 1