II.1.1)
Title attributed to the contract by the contracting authority:
Provision and Operation of Campus Residences for Dublin City University
II.1.2)
Type of contract and location of works, place of delivery or of performance
Works
Realisation, by whatever means of work, corresponding to the requirements specified by the contracting authorities
Main site or location of works, place of delivery or of performance:
II.1.3)
Information about a public contract, a framework agreement or a dynamic purchasing system (DPS)
The notice involves a public contract
II.1.5)
Short description of the contract or purchase(s)
Provision and Operation of Campus Residences for Dublin City University
II.1.6)
Common procurement vocabulary (CPV)
66122000
Corporate finance and venture capital services
45000000
Construction work
45211000
Construction work for multi-dwelling buildings and individual houses
45212410
Construction work for lodging buildings
45214400
Construction work for university buildings
71310000
Consultative engineering and construction services
71315210
Building services consultancy services
71315200
Building consultancy services
71315000
Building services
79993000
Building and facilities management services
71200000
Architectural and related services
71220000
Architectural design services
71221000
Architectural services for buildings
71240000
Architectural, engineering and planning services
71250000
Architectural, engineering and surveying services
71251000
Architectural and building-surveying services
II.1.7)
Information about Government Procurement Agreement (GPA)
The contract is covered by the Government Procurement Agreement (GPA):
yes
This contract is divided into lots:
no
II.1.9)
Information about variants
Variants will be accepted:
yes
II.2)
Quantity or scope of the contract
II.2.1)
Total quantity or scope:
Phase One of the Campus Residences Plan comprises two main elements:
i. The construction of an additional 850 bedrooms, 570 on the DCU Glasnevin Campus and 280 on the current St Patrick’s Campus in Drumcondra. All of the development will take place on DCU property.
ii. The buyback of the existing block of 437 bedrooms referred to above.
Estimated cost excluding VAT: 100000000
EUR
II.2.2)
Information about options
II.2.3)
Information about renewals
This contract is subject to renewal: no
II.3)
Duration of the contract or time limit for completion
Starting 04.
05.
2015
Completion 21.
12.
2018