The site is located to the east of the ESB Poolbeg Power Generation Plant, Dublin and will be managed by NORA. To meet these responsibilities NORA has signed a 20 year lease with ESB for the use of the Tank Farm facility. The Tank Farm is only partially in use to provide an emergency supply of Diesel fuel for the adjacent ESB Power station which is supplied from 2 No. Tanks (D1 and D2). ESB have agreed to empty one Tank D2 which will be isolated cleaned and inspected prior to this works taking place. On completion of the works detailed in this specification ESB will transfer the product from Tank D1 to Tank D2 to allow the cleaning, inspection and repair / refurbishment of Tank D1. The site is ship fed from a dedicated marine Jetty located to the North of the site and is accessed via the ESB site. To achieve a fully functioning storage facility for distillate products it will be necessary to complete an upgrade of the Tank Farm facilities to meet with current industry practices.
Works
08/07/2016 12:00:00
45255000-9 Construction work for the oil and gas industry
44162000-3 Piping
44611000-6 Tanks
44611410-3 Oil-storage tanks
45000000-7 Construction work
45111200-0 Site preparation and clearance work
45111291-4 Site-development work
45113000-2 Siteworks
45213200-5 Construction work for warehouses and industrial buildings
45213250-0 Construction work for industrial buildings
45231100-6 General construction work for pipelines
45232451-8 Drainage and surface works
45255210-4 Oil terminal construction work
45310000-3 Electrical installation work
45315300-1 Electricity supply installations
45315600-4 Low-voltage installation work
50514100-2 Repair and maintenance services of tanks
71242000-6 Project and design preparation, estimation of costs
71320000-7 Engineering design services
71322000-1 Engineering design services for the construction of civil engineering works
71322200-3 Pipeline-design services
71323000-8 Engineering-design services for industrial process and production
71630000-3 Technical inspection and testing services
National Oil Reserves Agency
Building Number 3, Number One Ballsbridge, 126 Pembroke Road
Ballsbridge
Dublin 4
Ireland
View profile
Project Design
| Notice | Date of dispatch |
|---|---|
| Contract notice (TED (v209)) | 18/05/2016 12:10 |
| Contract award notice (TED (v209)) | 28/12/2016 12:10 |