Dodder Flood Alleviation Works - New Bridge Parapet Raising and Strengthening Works

The Contractor shall design and construct the New Bridge parapet upgrade works which include parapet raising and strengthening using a post tensioning solution. The Contractor shall increase the height of the existing parapet to a minimum level of 5.22m OD Malin. The parapet strengthening solution shall be designed for vehicle impact loading and hydraulic loads associated to a 1 in 200 year flood event.

Works

24/03/2016 14:00:00

45221119-9  Bridge renewal construction work
45246400-7  Flood-prevention works


Dublin City Council
Civic Offices, Wood Quay
Dublin
Dublin 8
Ireland
View profile

Dave Weston

Published notices
Contract Notice (eTenders) 26/02/2016 18:00
Contract Award Notice (eTenders) 17/08/2016 17:00
Lots
Dodder Flood Alleviation Works - New Bridge Parapet Raising and Strengthening Works
Awarded supplier:

Clonmel Enterprises Ltd, organisation no: 2740100A

Additional information:
Documents Documents
Close