The project comprises of the design and construction of a Two Classroom Special Needs Unit 552m2 as per the standard DES schedule of accommodation at Our Lady's Secondary School Templemore. This newly appointed Design Team must liaise with a Design Team of a Major Project currently under construction at the school. This is to ensure that the design of the ASD unit is compatible with the Major Building Project. The design of the ASD unit will necessitate demolition work and the replacement of some existing accommodation. The unit must be fully integrated with the existing school building.
Services
31/07/2015 17:00:00
71000000-8 Architectural, construction, engineering and inspection services
71200000-0 Architectural and related services
71220000-6 Architectural design services
71221000-3 Architectural services for buildings
71300000-1 Engineering services
71310000-4 Consultative engineering and construction services
71311000-1 Civil engineering consultancy services
71312000-8 Structural engineering consultancy services
71322100-2 Quantity surveying services for civil engineering works
71324000-5 Quantity surveying services
71334000-8 Mechanical and electrical engineering services
Our Lady’s Secondary School
Templemore,
Co.
Tipperary
Ireland
View profile
Patricia Higgins
| Notice | Date of dispatch |
|---|---|
| Contract Notice (eTenders) | 24/06/2015 17:00 |
Full Design Team required for the provision of Additional Accommodation - 2 Classroom Special Needs Unit (552m2)