Total replacement of existing pipework within original school to comply with current guidelines with new panel radiator and controls. Existing boiler retained.The existing space heating installation was installed when the school was built in 1973. Extensions were built in the late 1970’s and again in 2009 & 2012, a t wo piped system in accordance with current requirements were installed within the extension works in 2009 and 2012. The proposed and recommended works are fo r the total replacement of the existing piped system of distribution which essentially comprises of single piped circuits within the original school, in order to upgrade to requirements in accordance with the current T.G.D’s. The area of the existing school, excluding the classroom extension of 2009 & 2012 is approximately 920 m2. As part of the proposed works the existing system of pipe distribution would be replaced to meet current T.G.D. guidelines. Also, as part of th e said works new panel radiators and a new system of controls would be provided as the installed surfaces in a number of the rooms do not meet requirements in ter ms of comfort levels.It was noted that sections of pipework are carried undergroun d. A new space heating boiler was installed in recent years as part of extension wo rks.Remedial/ongoing works have only been carried out to the existing system of di stribution where leaking radiator valves have been replaced over the years. No oth er works to this system have been carried out since installation. The existing pipew ork system is a single pipe loop, for the most, and doesn’t lend itself to individual co ntrols in accordance with current T.G.D’s.As part of the said works new panel radia tors are also to be provided. The existing space heating boiler which was installed i n recent years would be retained. A new system of controls would also be provided .The existing pipework system is a single pipe loop, for the most, and doesn’t lend it self to individual controls.
Services
23/04/2014 12:00:00
44000000-0 Construction structures and materials; auxiliary products to construction (except electric apparatus)
Scoil Realt na Mara (Kilmore)
Kilmore
Co.Wexford
Kilmore
Ireland
View profile
Yvonne Miller
| Notice | Date of dispatch |
|---|---|
| Contract Notice (eTenders) | 01/04/2014 15:10 |
Upgrade mechanical. Total replacement of existing pipework within original school to comply with current guidelines, new panel radiators and controls. Existing boiler retained.