Bord na Móna Plc and specifically Bord na Móna Energy Ltd have completed a high level feasibility study examining the potential for developing a large area of cutaway peat land and other adjacent areas as a single interconnected large scale wind farm. The energy generated by the development will be sent through one or two proposed interconnector(s) across the Irish Sea into the UK. In order to inform the proposed development a set of targeted baseline environmental surveys are required. As part of the baseline environmental studies a Mammal survey is required. The survey will be required to be carried out to the standard that will allow submission and utilisation of the data generated as part of an Environmental Impact Statement. The lands indentified include the following areas: • Ballydermot/Timahoe Bog group • Derrygreenagh Bog group
Services
17/06/2014 18:00:00
71355000-1 Surveying services
79311000-7 Survey services
79311200-9 Survey conduction services
Bord Na Mona
Main Street
Newbridge
Co.Kildare
Ireland
View profile
Gerard Ryan
http://www.bordnamona.ie
| Notice | Date of dispatch |
|---|---|
| Contract Notice (eTenders) | 21/02/2014 18:00 |