CCE/5152/GC - Enhancement of User Worked Level Crossings

Iarnród Éireann is looking for suitable companies to assist in providing technological solutions to improve the operation of our User Worked Level Crossings. It is envisaged that this will be through the provision of technological solutions which will be developed and installed at level crossings to aid the level crossing user in his operation of the crossing in conjunction with current requirements. The project will consist of two phases: Phase 1: The design of solutions for the various types of crossings, the installation of these solutions at trial sites, the successful integration of these sites into our infrastructure, the monitoring and development of the sites and the full approvals process to gain acceptance from the Railway Safety Commission. Phase 2: The roll-out of the approved solutions and system maintenance.

Services

19/02/2014 12:00:00

34632000-6  Railways traffic-control equipment
34940000-8  Railway equipment
48140000-1  Railway traffic control software package


Iarnród Eireann-Irish Rail
Connolly Station,
Dublin
Dublin
Ireland
View profile

Gavin Cahill
http://www.irishrail.ie

Published notices
Contract Notice (eTenders) 17/01/2014 14:00
Contract Notice - Utilities (TED (2.0.7 old not supported version)) 17/01/2014 14:00
Contract Award Notice (eTenders) 17/09/2015 17:00
Contract Award Notice (TED (2.0.7 old not supported version)) 17/09/2015 16:25
Lots
Enhancement of User Worked Level Crossings
Additional information:
Documents Documents
Close View notice