Realignment of approximately 360m of the R252 Regional Road between Ballybofey and Fintown in County Donegal. The R252 crosses the Elactagh River which is a tributary of the River Finn which forms part of the River Finn Special Area of Conservation (SAC). The project requires the following works to be carried out; • Traffic management to maintain traffic over the existing online Bailey Bridge on the R252; • Construction of a new integral bridge (Clear span of 13.100m) south of the existing bridge with reinforced concrete abutments and wingwalls, precast concrete prestressed beams and precast concrete parapet walls; The location of this bridge is within a Special Area of Conservation (SAC) of the River Finn. • Realignment of approximately 360m of roadway with 260m following the existing R252 Regional Road and 100m on green field • Tie in to existing side roads and accesses to dwellings; Removal of existing Bailey Bridge • Installation of a Road Safety Barrier System; • Undergrounding of existing telecom and electricity services; • Installation of new watermains and connections to existing watermains; Road Signage and Road markings • Miscellaneous accommodation works
Works
15/07/2013 12:00:00
45000000-7 Construction work
45200000-9 Works for complete or part construction and civil engineering work
45220000-5 Engineering works and construction works
45221000-2 Construction work for bridges and tunnels, shafts and subways
45221100-3 Construction work for bridges
45221111-3 Road bridge construction work
Donegal County Council
County House
Lifford
Co Donegal
Ireland
View profile
stephen mc crory
http://www.donegalcoco.ie
| Notice | Date of dispatch |
|---|---|
| Contract Notice (eTenders) | 06/05/2013 08:00 |
| Contract Award Notice (eTenders) | 15/08/2013 17:00 |