Bandon FRS Hydrometric Station - Demolition of existing Hydrometric Station, site clearance and all works for new Hydrometric Station

The works include: Site clearing and preparation works;  Demolition of the existing Hydrometric Station building;  New works on the river embankment to prepare foundations of the staircase;  Foundation slabs for staircase;  Prefabricated Steel staircase with handrail;  Chamber;  Ducting for sensors;  Perforated Steel pipe in gravel wrapped in a Geotextile membrane;  Fencing and Gate;  Other miscellaneous associated works.

Works

17/05/2023 12:00:00

45246000-3  River regulation and flood control works
45200000-9  Works for complete or part construction and civil engineering work
45240000-1  Construction work for water projects
45246410-0  Flood-defences maintenance works
45248000-7  Construction work for hydro-mechanical structures


Office of Public Works (OPW)
Jonathan Swift Street
Co. Meath, C15 NX36
Trim
Ireland
View profile

Fiona Martin
https://www.gov.ie/en/organisation/office-of-public-works/

Published notices
Contract Notice (eTenders) 25/04/2023 17:00
Lots
Demolition of existing Hydrometric Station, site clearance and all works for new Hydrometric Station
Additional information:
Documents Documents
Close