Through a phased ground investigation, comprising both intrusive and non-intrusive exploratory methods, landfill material was identified to the immediate south and east of an existing ESB pylon (wooden pole set), carrying 110kV powerlines. As part of the broader proposed Whitestown remediation works, this material will be removed by means of excavation and replaced with suitable fill material (imported Class 1 fill or lean mix concrete if deemed necessary). Excavation will be undertaken on a phased approach within manageable bays to ensure the stability of the adjacent pylon. The critical excavation works, which are located to the south of the ESB pylon and beneath the powerlines, will be undertaken during a designated powerline outage period. The remaining excavation works, to the east of the pylon, can be undertaken when the powerlines are live. The anticipated works will be subject to ESB Networks - Code of Practice for Avoiding Danger from Overhead Electricity Lines (COP).
Works
02/05/2023 12:00:00
45000000-7 Construction work
45200000-9 Works for complete or part construction and civil engineering work
45220000-5 Engineering works and construction works
45222000-9 Construction work for engineering works except bridges, tunnels, shafts and subways
Wicklow County Council
County Buildings
Wicklow
Wicklow
Ireland
View profile
Mary Cahill
| Notice | Date of dispatch |
|---|---|
| Contract Notice (eTenders) | 12/04/2023 15:00 |
| Contract Award Notice (eTenders) | 02/06/2023 15:44 |
Priority Construction Ltd, organisation no: 9D53971I