Shackleton Museum - Alterations and extension of Athy Heritage Centre to provide for Shackleton Museum and exhibition spaces.

The RFT has ended, you cannot answer the invitation.

Reconfiguration, refurbishment and extension of existing, protected three-storey building. Two-storey glass and steel extension to south of building (by specialist designer and sub-contractor) will require partial demolition of central bay of existing façade. Internal re-configuration will include the removal of 1 no. mezzanine, 1 no. lift and 2 no. stairways, with the addition of 1 no. mezzanine, 1 no. lift and 2 no. stairways in different locations. Associated site works include connection to below ground utilities and landscaping. There will be concurrent works (outside of this contract) to the adjacent public realm and for the exhibition and museum display fit-out.

Works

03/03/2023 15:00:00

45210000-2  Building construction work
44221000-5  Windows, doors and related items
45000000-7  Construction work
45111100-9  Demolition work
45212300-9  Construction work for art and cultural buildings
45212310-2  Construction work for buildings relating to exhibitions
45212313-3  Museum construction work
45212350-4  Buildings of particular historical or architectural interest
45300000-0  Building installation work
45310000-3  Electrical installation work
45320000-6  Insulation work
45330000-9  Plumbing and sanitary works
45350000-5  Mechanical installations
45400000-1  Building completion work
45454100-5  Restoration work


Kildare County Council
Aras Chill Dara
Devoy Park
Co. Kildare
Ireland
View profile

Annette Keaveney

Published notices
Contract Notice (eTenders) 13/01/2023 21:44
Lots
Alterations and extension of Athy Heritage Centre to provide for Shackleton Museum and exhibition spaces.
Additional information:
Documents Documents
RFT mailing address:
Aras Chill Dara
Devoy Park, Naas
Co. Kildare
Ireland
Close