CR P2 DEVELOPMENT - The Contracting Authority (Connacht Rugby Stadium Ltd.) is seeking to appoint a Works Contractor (on a Design & Build basis) for the Redevelopment Works to the Sportsground, College Rd, Galway -

The Redevelopment of the Sportsgrounds, College Road, Galway - Phase 2 – North Stand and High-Performance Centre & Associated External Works generally consists of the following: • Phase 2A - A new High-Performance Centre comprising of a new indoor synthetic training pitch and office accommodation which will incorporate offices and player welfare facilities (canteen, treatment rooms, etc). This new High-Performance Centre is adjacent to the existing Bohermore Cemetery wall which is within the curtilage of a site with a protected structure. • Phase 2B – Demolition of existing structures consisting of existing Clan Stand, Clan Bar, Clubhouse, Dressing Rooms and other ancillary buildings and construction of a new North Stand. • Site development works including drainage network, car parking, access roads, landscaping, utilities, substation and storage buildings will carried out throughout the three phases listed above.

Works

06/12/2022 12:00:00

45212200-8  Construction work for sports facilities
45000000-7  Construction work
45112000-5  Excavating and earthmoving work
45113000-2  Siteworks
45200000-9  Works for complete or part construction and civil engineering work
45232452-5  Drainage works
45262650-2  Cladding works
45310000-3  Electrical installation work
45350000-5  Mechanical installations


Connacht Rugby Stadium Ltd
The Sportsground, College Road
Co.Galway
Galway
Ireland
View profile

Enda Fenton

Published notices
Contract notice (TED (v209)) 20/10/2022 16:11
    Corrigendum (TED (v209)) 21/11/2022 11:11
Lots
The Contracting Authority (Connacht Rugby Stadium Ltd.) is seeking to appoint a Works Contractor (on a Design & Build basis) for the Redevelopment Works to the Sportsground, College Rd, Galway -
Additional information:
Documents Documents
Close