1no. mainstream classroom, resource room, link, 1 no. accessible WC, Modifications to Existing, Demolitions & Tie-ins, traffic calming & setdown, access, relocation of existing prefab to accommodate the new extension and including all associated site works as required, described & indicated on the drawings including Architectural, M&E Building Services, Civil & Structural Engineers, Fire and DAC packages & all External Works as required to complete.
Works
13/10/2022 03:30:00
44000000-0 Construction structures and materials; auxiliary products to construction (except electric apparatus)
44100000-1 Construction materials and associated items
45000000-7 Construction work
45210000-2 Building construction work
45214200-2 Construction work for school buildings
45310000-3 Electrical installation work
45311000-0 Electrical wiring and fitting work
45350000-5 Mechanical installations
45351000-2 Mechanical engineering installation works
71333000-1 Mechanical engineering services
71334000-8 Mechanical and electrical engineering services
Poulacapple National School
Via Callan
Co.Tipperary
Kilkenny
Ireland
View profile
Eddie Doyle
| Notice | Date of dispatch |
|---|---|
| Contract Notice (eTenders) | 13/09/2022 15:00 |