Bridges Rehabilitation 2022 - Leinster Road Bridges Rehabilitation Contract 2022

The works involve the rehabilitation of a number of bridges in the Leinster area. The extent of the works differs on each structure. Typical items to be addressed across various structures include: Waterproofing and resurfacing of the existing bridge deck, realignment of road over the structure to accommodate pedestrian / cycle routes, additional drainage, expansion joint replacement, bearings cleaning and repainting, parapet repair and replacement. The bridges that are included in the Contract are: 1) KE-M07-023.00 Great Connell Overbridge 2) KE-M07-025.00 Corbally Road Bridge 3) KE-M07-028.00 Newbridge Road Bridge 4) KE-M07-030.00 Newhall Road Bridge 5) KE-M09-053.00 Kineagh Road Overbridge 6) LS-M07-044.00 Ballydavis Interchange 7) FG-M50-015.00 M50/N3 Interchange Bridge North 8) FG-M50-018.00 M50/N3 Interchange Bridge South 9) KK-N10-008.00 Ossary Bridge

Works

05/08/2022 16:00:00

45221119-9  Bridge renewal construction work
44212120-6  Structures of bridges
45000000-7  Construction work
45221000-2  Construction work for bridges and tunnels, shafts and subways
45221100-3  Construction work for bridges
45221110-6  Bridge construction work
45221111-3  Road bridge construction work
45233100-0  Construction work for highways, roads
45233120-6  Road construction works
45233121-3  Main road construction works
45233141-9  Road-maintenance works
45233142-6  Road-repair works
45233220-7  Surface work for roads


Kildare County Council
Aras Chill Dara
Devoy Park
Co. Kildare
Ireland
View profile

Aidan Farrell

Published notices
Contract Notice (eTenders) 27/06/2022 19:30
Lots
Leinster Road Bridges Rehabilitation Contract 2022
Additional information:
Documents Documents
Close