The works shall consist of (i). Internal refurbishment works to the 1980s block, including new floor and ceiling finishes, disposal of Asbestos Containing Materials, new internal doors, new sanitary ware, alterations of classroom toilet layouts, new classroom fixtures and fittings, new accessible toilet and (ii). Energy Retrofit works to the school building to include insulated external render system, pumped cavity wall insulation, partial internal drylining works, new insulated roof coverings, new external windows and doors and air tightness works to external wall openings, electrical upgrade works to include new lighting installation, PV panels, emergency lighting, EV charging and electrical works to new heating installations, new back up gas boiler installation, new heating and distribution pipework and radiators, new renewable heating installation, BMS system and controls, MVHR installation, all associated external trenching and ducting to facilitate new building services. It is anticipated the Works Programme are to be completed during 2022. The works are to be completed in a phased and sequential manner to facilitate continual school operational capacity.
Services
08/04/2022 17:00:00
44115800-7 Building internal fittings
45000000-7 Construction work
45210000-2 Building construction work
45214200-2 Construction work for school buildings
45261410-1 Roof insulation work
45262660-5 Asbestos-removal work
45320000-6 Insulation work
45321000-3 Thermal insulation work
45350000-5 Mechanical installations
45453100-8 Refurbishment work
51100000-3 Installation services of electrical and mechanical equipment
51110000-6 Installation services of electrical equipment
Scoil Mhuire (Abbeyleix)
Ballyroan Road
Co.Laois
Abbeyleix
Ireland
View profile
Paul Scott
| Notice | Date of dispatch |
|---|---|
| Contract Notice (eTenders) | 22/03/2022 13:00 |