The hub centre and office development project at Humber Mall, Castlebar, Co. Mayo has received planning permission, fire cert and DAC and the project is now preparing for construction stage. To this end, construction drawings, BOQ, M&E specifications, etc are required to allow tendering for construction to take place.
Services
09/08/2021 17:00:00
71000000-8 Architectural, construction, engineering and inspection services
71200000-0 Architectural and related services
71210000-3 Advisory architectural services
71220000-6 Architectural design services
71221000-3 Architectural services for buildings
71240000-2 Architectural, engineering and planning services
71250000-5 Architectural, engineering and surveying services
BCM Business Cost Management Limited
BCM House, 18 Mallow St., Limerick
Co. Limerick
Limerick
Ireland
View profile
John Mac Namara
http://www.bcmcorporate.com
| Notice | Date of dispatch |
|---|---|
| Contract Notice (eTenders) | 09/07/2021 17:00 |
| Contract Award Notice (eTenders) | 29/09/2021 14:17 |
The hub centre and office development project at Humber Mall, Castlebar, Co. Mayo has received planning permission, fire cert and DAC and the project is now preparing for construction stage. To this end, construction drawings, BOQ, M&E specifications, etc are required to allow tendering for construction to take place.