"Tipperary County Council and Thurles Municipal District are now working towards the provision of new footways/cycle paths and improvements to existing footways adjacent to the River Suir and its tributary, the Drish River. The overall development now under consideration is sub-divided into four phases as follow: 1. Phase 1, extending along the west bank of the River Suir from the footbridge adjacent to the Town Park at Thomond Road as far as Thurles Golf Club; 2. Phase 2, extending northwards along the east bank of the River Suir as far as its confluence with the Drish River and from there along the south bank of the Drish River as far as the bridge on Mill Road; 3. Phase 3, extending along the Drish River from the bridge on Mill Road to the N75 National Secondary Road on the outskirts of Thurles; 4. Phase 4, extending from the bridge on Mill Road for a distance of approximately 1km northwards along Mill Road to meet up with the existing footpath. The Project, to which this Consultant’s Brief (May 2021) (the “Brief”) relates, consists of the following elements of the overall development:- · The preliminary design, route selection and preparation of the overall Master Plan in respect of Phases 1 to 4 inclusive, and · The Part 8 planning process, the detailed design, tender, construction and handover stages of Phases 1 and 2 only."
Services
05/07/2021 12:00:00
71310000-4 Consultative engineering and construction services
71311000-1 Civil engineering consultancy services
71313000-5 Environmental engineering consultancy services
71318000-0 Advisory and consultative engineering services
71530000-2 Construction consultancy services
Tipperary County Council
Civic Offices
Co.Tipperary
Clonmel
Ireland
View profile
Stephen Ryan
http://www.tipperarycoco.ie
| Notice | Date of dispatch |
|---|---|
| Contract Notice (eTenders) | 09/06/2021 11:00 |
Fehily Timoney and Company, organisation no: IE6580497D