Howth Boatyard Bay Resurf. Ph2 - Upgrade of up to 2 no. existing boatyard work bays in Howth FHC with new drainage and concrete surface

Boatyard work bay upgrade in up to two lots of circa 520 sq.m each. Excavate, dispose off site at licenced facility of existing life expired asphalt surfacing, installation of drainage pipework, gullies and manholes ( depth not greater than 2m) suttering and placing of RC concrete slab to line and levels with box out around existing rails, grout and concrete around rails. each lot to be constructed in two phases to allow DAFM replacement of life expired rails. First lot to be awarded for construction in summer 2021, second lot may be awarded subject to available funding and may be carried out in Q3 or 4 of 2021 or Q4 2021 into Q1 2022

Works

23/06/2021 12:00:00

45220000-5  Engineering works and construction works
45222000-9  Construction work for engineering works except bridges, tunnels, shafts and subways
45223300-9  Parking lot construction work
45223700-3  Service area construction work
45241000-8  Harbour construction works
45244100-0  Marine installations
45520000-8  Hire of earthmoving equipment with operator


Department of Agriculture, Food and the Marine
Agriculture House
Kildare Street
Dublin 2
Ireland
View profile

John Farragher
http://www.agriculture.gov.ie

Published notices
Contract Notice (eTenders) 19/05/2021 08:00
Contract Award Notice (eTenders) 10/08/2021 12:00
Lots
Upgrade of South West bay in Boatyard
Additional information:
Documents Documents
Upgrade of Middle West bay in Boatyard
Additional information:
Documents Documents