The project consists of construction works across the school including installation of new extensions totalling approximately 270 square metres and the modification of internal and external walls, renovation of internal areas, windows, doors, etc. and connection of existing heating system to new gas boiler system. Upgrades to external areas and connection to existing foul and surface water systems are also included. All services including sewers, electricity, telecom and water will be connected into the existing and revised facilities with upgrades where necessary. External works including ramps, tarmacing, footpaths, line marking, etc. will also be included. Also included are service connections to the existing school water, heating, electrical and ICT systems. Tender documents are available by emailing the project consultant at newtownns@newelleng.ie
Works
08/04/2021 17:00:00
45214200-2 Construction work for school buildings
45214210-5 Primary school construction work
Newtown National School (Tuam)
Abbeyknockmoy
Co.Galway
Tuam
Ireland
View profile
Patrick Newell
| Notice | Date of dispatch |
|---|---|
| Contract Notice (eTenders) | 12/03/2021 14:30 |